ML20011A262
| ML20011A262 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/05/1981 |
| From: | Colbert W DETROIT EDISON CO. |
| To: | Kintner L Office of Nuclear Reactor Regulation |
| References | |
| RTR-REGGD-01.127, RTR-REGGD-08.013, RTR-REGGD-08.014, RTR-REGGD-08.015, RTR-REGGD-08.026, RTR-REGGD-1.127, RTR-REGGD-8.013, RTR-REGGD-8.014, RTR-REGGD-8.015, RTR-REGGD-8.026, RTR-REGGD-8.15 EF2-55-041, EF2-55-41, NUDOCS 8110080396 | |
| Download: ML20011A262 (2) | |
Text
_
1 MI Edison !Es?!!E='=
.0ctober 5, 1981 EF2 - 55,041 Mr. L, L. 'fintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555
Dear Mr. Kintner:
Reference:
Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 Sut.jects Detroit Cdison Position on Regulatory Guides 1.127, 8.13, 8.14, 8.15 and 8.26 In response to your request, we send you the enclosed Detroit Edison Company positions on Regulatory Guides 1.127, 8.13, 8.14, 8.15, and 8.26.
Detroit Edisc, plans to include this information in the next revision of the Fermi 2 FSAR.
Sincerely, M
W. F. Colbert /
Technical Director Enrico Fermi 2 WFC:j1 Ericlosure cc:
Mr. B. Little 300l s
l {
'0110000396 811005~
. PDR ADOCK 05000341 A
PDR t
t
Enclosure to EF2-55,041 s
Detroit Edison Company Positions on NRC Regulatory Guides 1.127, 8.13, 8.14, 8.15 and 8.26 e
g Regulatory Guide 1.127 (3/1978, Rev. 1), Inspection of V
4 Eater Control Structures Associated with Nuclear Power Plants This Guide applies to the Fermi 2 shore barrier.
The procedure necessary for inspection and maintenance of this structure is in accordance with Regulatory Guide 1.127, Revision 1, and will be included in the Plant Operating Manual.
As indicated in response to item 321 5 in Appendix E.5 of the FSAR, the shore barrier will be resur-veyed by Edison on an annual basis and after storms in which the crest elevation of incident waves at the shore-line exceeds the top of the shore barrier.
Regulatory Guide 8.13 (Revision 1, 11/75)
Instruction Concerning Prenatal Radiation Exposure Fermi 2 will be in conformance with the requirements of this guide.
Regulatory Guide 8.14 (Revision 1, 8/77)
Personnel Neutron Dosimeters Fermi 2 will be in conformance with the requirements of this guide.
Regulatory Guide 8.15 (10/76)
Acceptable Programs for Respiratory Protection Fermi 2 will be in cor.formance with the requirements of this guide.
Regulatory Guide 8.26 (9/80)
Applications of Bioassay for Fission and Activation Products The Fermi 2 bioassay program will be in conformance with the requirements of this guide.
/
y g