ML20011A032

From kanterella
Jump to navigation Jump to search
Advises That Final Results Re Safety Relief Valve Operability Test Rept, Are Contained in NEDE-24988-P, Analysis of Generic BWR Safety Relief Valve Operability Test Results, in Response to NUREG-0737,Item II.D.1
ML20011A032
Person / Time
Site: Zimmer
Issue date: 10/01/1981
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM NUDOCS 8110060378
Download: ML20011A032 (2)


Text

a g,_ -

I - Ib

, e, -m _ _

THE CINCINNATI GAS & ELECTRIC COMPANY set CINCINN ATf. OHIO 45201 E. A. BOR3 MAN N stNion vicE PRE $4 DENT Docket No. 50-358 October 1, 1981 N

/

U.S.

Nuclear Regulatory Commission

.A

.h o Division of Licensing g

O Office of Nuclear Reactor Regulation Washington, D.C.

20555 3

.,og'bi

~

Attention:

Mr. Darrell G.

Eisenhut, Director i-

SUBJECT:

WM.

H.

ZIMMER NUCLEAR POWER STATION -

[

UNIT 1 - SAFETY / RELIEF VALVE (S/RV)

' [il l

OPERABILITY TEST REPORT

REFERENCES:

1)

Letter from T.

Dente (BWR Owners' Group) to D.

G.

Eisenhut (NRC), " Transmittal of Valve Operability Test Report from Generic BWR Safety / Relief Valve (SRV) Test Program" dated July 1, 1981 2)

Letter from E. A. Borgmann to D. G.

Eisenhut (NRC), " Preliminary Safety / Relief Valve (S/RV) Operability Test Results for Zimmer Plant" dated July 1, 1981 Gentlemen:

This is in response to NUREG-0737, Item II.D.l.

The final test results are contained in NEDE-24988-P, " Analysis of Generic BWR Safety / Relief Valve Operability Test Results" which was submitted to the NRC via Reference 1.

The Cincinnati Gas & Electric Company is a participant in the BWR Owners Group generic S/RV operability test program.

The test results demonstrate the operational adequacy of the S/RV's and the adequacy of the S/RV discharge piping and supports for the Zimmer Station.

The Zimmer Station employs the CROSBY 6R10 type of S/RV, Model No. HB-65-BP-FN.

The applicability of the generic test results to this plant's S/RV's has already been demonstrated in Reference 2.

\\Q h

O

(

4 To:

U.S. Nuclear Regulatory Commission October 1, 1981

Subject:

Wm.

H. Zimmer Nuclear Power Station -

Page #2 Unit 1 - Safety / Relief Valve (S/RV)

Operability Test Report A review of the test report shows that the operational adequacy of the S/RV's and the piping and supports for Zimmer Station has been demonstrated for the conditions defined in Item II.D.l.

The submittal of NEDE-24988-P and this letter satisfies the October 1, 1981 and January 1, 1982 submittal requirements of Item II.D.1 and completes The Cincinnati Gas

& Electric Company's efforts on this item.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY m

~ ~ - ~ ~ _

By E. A. BORCMANN EAB: dew cc:

John H.

Frye III M.

Stanley Livingston Frank F.

Hooper Troy B.

Conner, Jr.

James P. Fenstermaker Steven G.

Smith William J. Moran J.

Robert Newlin Samuel H.

Porter James D.

Flynn W.

F.

Christianson W.

Peter Heile James H. Feldman, Jr.

John D. Woliver Mary Reder David K. Martin George E.

Pattison Andrew B.

Dennison State of Ohio

)

County of Hamilton)ss Sworn to and subscribed before me this

/g day of October, 1981.

0 M

Notaff p lic MARILYN J. LUERSEN wtny PuhEc, State of Ohio My Commission Empires June 7,1988

-