Ap;mndix A NOTICE OF VIDIATION Illinois Power Company Docket No. 50-461 As a re.' > of the inspection conducted on August 1 through August 31, 1981, ara in acconiance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified:
10 CFR 50, Appendix B, Criterion IX, Control of Special Processes, states: -
" Measures shall be established to assure that special processes, including welding.....are accomplished by qualified personnel using qualified pro.-
cedures in accordance with applicable codes, standards, specifications, criteria, etc."
Baldwin Welding Proc. dure NP-8-8-BA-21/2, Pigure 2. specifies the use of only1/8"or3j32"sizeEXXXelectrodeforwcldsoftheMainSteam Quencher Supports to the Suppression Pool Floor.
Baldwin Project Procedure BAP 1.9, paragraph 4 3 states: " Tools used on Stainless Steels....shall assure files, deburring tools, wire brushes, etc.
are clearly identified as to the surface material on which they are to be used, i.e., handles or butt of tools shall be marked with purple tape or paint."
Contrary to the above, the Contractor was perfoming stainlesa steel l
welding operations ucing oversize electrode (5/32") and unmarked wire brushes, discs, chisel, and chipping hammers.
This is a Severity Level V violation (Supplement II).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written state-ment or explanation in reply, including for each item of noncompliance:
(1) corrective action taken and the results achieved (2) corrective action to be taken to avoid further noncompliance; and (3) ;he date when full t
compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
Consideration may be given to extending your response time for good cause shown.