ML20011A000
| ML20011A000 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 08/12/1981 |
| From: | Koch L ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20010J675 | List: |
| References | |
| 0981-6, 981-6, U-0276, U-276, NUDOCS 8110060343 | |
| Download: ML20011A000 (1) | |
Text
/2~
0981-6
~
U-0276 Q37 -81(08-12) - 6 ILLINDIS POWER 00MPANY jIP L
500 SOUTH 27TH STREET. DECATUR, ILLINOIS 62525 August 12, 1981 Mr. James G. Keppler Director, Region III Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn,IL 60137
Dear Mr. Keppler:
Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 Construction Permit No. CPPR-137 & CPPR-138 This
. a reply to your letter of June 23, 1981, regarding a safety inspection conducted by I.T. Yin on June 5-6, 1981.
By that latter, you requested documentation supporting our conclusion that the as-built condition of the seismic guide assemblies does not constitute a safety problem.
Enclosed are the following reports and documents:
1.
S&L Report #EMD-029686, Rev. 00, dated 4/24/81
" Summary Report for Guardpipe Dynamic Guide Assemblies" 2.
Inter-Office Memorandum, M.A. Atia to Mechanical /
Engineering Mechanics; File No. EMD#030051, dated April 24, 1981 3.
Nonconformance Report NCR No. 4151 prepared by R.L. Neeb, (Includes Seismic Guide Clearance Test Results)
February 27, 1981 We believe that these documents substantiate the acceptability of the CPS pipe penetration assemblies / seismic guides.
As a final investigation to support our conclusion, we will monitor the thermal expansion of each penetration process pipe during the initial line heat-up.
We will advise the NRC Resident Inspector in advance of the schedule for such tests so that the NRC may review the test procedure and/or witness the tests.
I trust this information satisfies the requirements stated in your letter of June 23, 1981.
Sincere y, sq L
Koch ice President AUG 18 1981i di enc.
cc:
H.H. Livermore, CPS Resident Inspector Director, Office of I&E-Director, Quality Assurance 8110060343 811001_~13 PDR ADOCK 05000461 f
PDR '