ML20010J641
| ML20010J641 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/23/1981 |
| From: | Wuller G ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| IEB-81-02, IEB-81-2, IEB-81-2-S1, U-0293, U-293, NUDOCS 8110060304 | |
| Download: ML20010J641 (1) | |
Text
-
e.
Ill/NOIS POWER COMPANY fy 79 z99_g3y_g 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 September 23, 198
/c\\
gW '~
n s
f p
N>
~h Mr. James G. Keppler
[
Director, Region III OCT 6198k i
I OUice of Inspection & Enforcement u.s. maa muwoes -
U.S. Nuclear Regulatory Commission N.
799 Roosevelt Road
\\/,\\
Glen Ellyn, Illinois 60137
\\'ir/) g g\\
Dear Mr. Keppler:
Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 Construction Permits No. CPPR-137 & CPPR-138 This is in response to your letter of Auguct 18, 1981, whereby you forwarded IE Bulletin No. 81-02, Supplement ~I which reported on the potential failure of Westinghouse Electro-Mechanical Division (W-EMD) gate type valves to close against differential priissure.
Please be advised that Clinton Unit 1 has no safety related motor-operated gate valves manufactured by W-EMD.
Sincerely, f
/
G. E. Wuller Supervisor-Licensing Nuclear Station Engineering JBD/lt cc:
H. H. Livermore, NRC Resident Inspector Director, NRC Office of I&E, Washington, D.C.
$6*I s W 8110060304 810923 PDR ADOCK 05000461 G
_______ -___