" THE CLEk ELAND ELECTRIC '
LUMIN ATING COMPANY P o Box 5000 m CLEVEL AND. ohio 44101 e 1 E' EF).CNE (216) 622-9800 e ILLUMINATING BLOG e 55 PUBLIC SQUARE Serving Tne Best Location in the Nation N
D:lwyn R. Davidson S
VICE PRESrOENT d
SVSTEV ENGINEER'NG AND CONSTRUCTION October 1, 1991 g]
g w
n Mr. Harold R. Denton, Director
/8g7 Office of Nuclear Reactor Regulation
%,ech A
U. S. Nuclear Regulatory Co:mnis.sion
},A 8
I Washington, D. C.
20555 0)
P Perry Nuclear Power Plan Docket Nos. 50-440; $v-W1 Amendment 4
Dear Mr. Denton:
1he Cleveland Electric Illuminating Company, acting on its own behalf and as agent for Toledo Edison, Ohio Edison, Duquesne Light and Penn-sylvania Power, is filing herewith three originals plus 60 copies of Amendment 4 to the Final Safety Analysis Report (FSAR) for the Perry Nuclear Power Plant, Units 1 and 2.
This Amendment consists of voluntary 6xt changes to update the FSAR and incorporates previously submitted responses to the Radiation j
Protection and Siting Analysis questions, q
The Amendment is in a format designed to keep current the licence application and FSAR. Please insert the revised Amendment 4 material dated October 2,1981 into the Final Safety Analysis Report as per the attached Amendment 4 Instruction Sheet.
Very Truly Yours, bf7 Dalwyn R. Davidson Vice President System Engineering and ConstrucLion DRD: mlb Enclosures cc:
G. Charnof f, Esq.
9
+
NEARea!P,g;;g
<