ML20010J478
| ML20010J478 | |
| Person / Time | |
|---|---|
| Issue date: | 09/14/1981 |
| From: | Mark J Advisory Committee on Reactor Safeguards |
| To: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| RTR-REGGD-01.033, RTR-REGGD-1.033, RULE-PR-50, TASK-OS, TASK-RS-902-4 ACRS-R-0941, ACRS-R-941, NUDOCS 8110050140 | |
| Download: ML20010J478 (1) | |
Text
Refst-bMI,
m.
[
'#7 UNITED STATES l'-
?,
NUCLEAR REGULATORY COMMISSION DS SI Il j
j f
,E ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, D. C. 20555 September 14, 1981 y
.y o
8, 'h '
U2 0
6d Mr. William J. Dircks
/
{(}f;..
j(
Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555
'qgg \\ \\
SUBJECT.
ACRS ACTION ON REGULATORY GUIDES AND REGULATIONS
Dear Mr. Dircks:
During its 257th meeting, September 10-12, 1981, the ACRS concurred in the regulatory positions of the following Regulatory Guide and in the revisions to 10 CFR Part 50:
1.
Regulatory Guide 1.33, Revision 3.(Task RS 902-4), " Quality Assurance Program Requirements (Operation)," dated July 1, 1981.
2.
Revisi:ns to 10 CFR Part 50, " Licensing of Production and Utilization Facilities," dated August 19, 1981.
(a) Section 50.12. " Specific Exemptions," paragraph (a).
(b) Section 50.55a, " Codes and Standards" paragraph (1).
(c) Section 50.60, " Acceptance Criteria for Fracture Prevention Measures for Light-Water Nuclear Power Reactors".
(d) Appendix G, " Fracture Toughness Requirements," and (e) Appendix H, " Reactor Vessel Material Surveillance Program Requirements."
Si ncerely,
J. Carson Mark Chairman cc:
H. Denton, NRR R. Minogue, RES G. Arlotto, RES W. Morrison, RFS E. Goodwin, NRR S. J. Chilk, SECY l
k$ DES
- "' '24 PDR