Final Deficiency Rept Re Procurement & Installation of safety-related Relay & Control Switches W/O Ref to Environ & Seismic Specs in IEEE Stds,Initially Reported on 801014. Engineering Directive Issued to Vendor
ML20010J291
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/15/1981
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, GO2-81-0290, GO2-81-290, NUDOCS 8109300264
Download: ML20010J291 (2)


Text

r ,

. . . . . 50.55(e) Report

[ Docket No. 50-397 Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashir:gton Way Richland, Washington 99352 (50..;372-5000 September 15, 1981 G02-81 -0290 3

m 'G Docket No. 50-397 Si g  ::cJ G g @.e 7

[l N h'

'_~

Mr. R. H. Engelken h "?

U.S. Nuclear Regulatory Commission [6

% (f y  ;

Region v - r2 -

Suite 202, Walnut Creek Plaza  % as SEP2s nib ~ .

1990 North California Boulevard Walnut Creek, California 94596

}

L

Dear Mr. Engelken:

4 "

m

Subject:

SUPPLY SYSTEM NUCLEAR PROJECT NO. 2 10CFR50.55(e) POTENTIALLY REPORTABLE CONDITION #120 CONTRACT 235 PROCUREMENT OF SAFETY RELATED EQUIPMENT LESS THAN IEEE STANDARDS In accordance with the provisions for reporting 10CFR50.55(e) conditions, your office was informed by telephone on October 14, 1980 of a potentially reportable condition regarding the procurement of safety related equipment to less than IEEE 323 requirements.

This condition has been evaluated and determined to be reportable. Attached is our final report on this matter.

Very truly yours,

/ f f ?r %

R./,G. Matlock' RGM/SLN/kh Pr'ogram Director, WNP-2

Attachment:

1. Final Repert cc:

WS Chin, BPA A Forrest, HAP 0 ND Lewis, NRC TA Mangelsdorf, Bechtel J Plunkett, NRC RE Snaith, B&R NY [y V Stello, NRC /

AD Toth, NRC Resident Inspector, WNP-2 WNP-2 Files [Iffi r

~

0109300264 8109157 PDR S

ADOCK 05000397l PDR'

$l-0 Ob-

r-ATTACHMENT 1 FINAL REPORT WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 LICENSES N0. CPPR-93 REPORTABLE DEFICIENCY AND CORRECTIVE ACTION FOR PROCUREMENT OF SAFETY RELATED EQUIPMENT TO LESS THAN IEEE 323 REQUIREMENTS SUPPLY SYSTEM NUCLEAR PROJECT NO. 2 Nature of Deficiency Approximately fifty (50) safety related relays and control switches were procured and installed without reference to environmental and seismic specifications required by IEEE 323.

Safety Implication These relays and switches are the control instrumentation for safety related switchgear. Their failure from extreme environment or seismic events could result in loss of ability to safely shut down the plant following a design basis accident.

CORRECTIVE ACTION Nonconformance Report (NCR) No. 235-05988 Revision 1 dated March 11, 1980 was issued against the General Electric Company, Installation and Service Engineering (GEI&SE) who purchased 'N relays and switches.

The NCR has been dispositioned to .myulre GEI&SE to:

i i 1. Provide test data to backup Certificate of Compliance for the l owner's review. If the supporting data does not provide

information that shows the devices to be qualified for Class lE

! service then the Contractor will be required to replace the existing devices with fully qualified devices.

2. Cancel orders for new devices and reorder devices from GE/NED with a requirement for environmental qualification in l accordance with IEEE 323 1974.

1

3. Replace nonqualified Agastat relays with Agastat nuclear qualified E7000 series relays.

A Project Engineering Directive (PED) number PED-235- E-0108 has been issued to GEI&SE that provides all specifications for procurement of qualified devices.

I 3