Interim Deficiency Rept Re Error in Assumptions Used in Modeling Load Transfer from Crossover Leg Restraint to Fill Slab & Containment Basement,Initially Reported by Bechtel on 810821.Final Rept Will Be Submitted by 811106
ML20010J041
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/17/1981
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, GN-145, NUDOCS 8109290538
Download: ML20010J041 (2)


Text

a ,

Telephone 404 522-6060 Southern Company Services. Inc. ( ) .\ g *

.) '

Post Office Boa 2625 '

Birmmgham, Alabama 35202 (% /

Telephone 205 870-6011 g 'l/

[c -

,$.g% Vf Ch 9~ '

,a 4 { ,s Q September 17, 1981 --

Q 'O -E' u} -~t9

\f4 4 United States Nuclear Regulatory Commission > ,

S , W.s_

]l

.'/

Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street File: X7B603 M19 Atlanta, Georgia 30303 Log: GN - 145

Reference:

50-424, 50-425; Design Calculations Concerning Primary Loop Crossover Leg Pipe Restraints Attention: Mr. James P. O'Reilly Gentlemen:

Georgia Power Company has evaluated the conditions associated with the assumptions used in modeling the load transfer from the cross-over leg restraint to the fill slab and containment basemat. It has been concluded that an error in the assumptions used for modeling constitctes a reportable deficiency. AddiH-'1 ally, Bechtel Power Corporation by letter dated August 21, 1981, has reported this event as a substantial safety hazard to Mr. Karl Seyfrit of the NRC, Region IV.

Georgia Power Company is submitting this report as an interim l

report and expects to submit a final report by November 6,1981.

This report contains no proprietary infomation and may be placed in the NRC Public Document Room upon receipt.

e Sincerely,f /

/

D. i0 Foster Project General Manager CWH:tlp Tb s ih 8109290538 810917 PDR ADOCK 05000424 S PlR

i Mr. James P. O'Reilly 50-424, 50-425; Containment Liner Penetrations - Unit 1

. September 17, 1981 page two xc: ~U. S. Nuclear Regulatory Commission

Attn
Victor J. Stello, Jr. , fairector j Office of Inspection and Enfor:ement i- Washington, D.C. 20555 J. H. Miller, Jr.

, R. J. Kelly. ,

. R. E. Conway G. F. Head i R. H. Pinson C. F. Whitmer i D. L. McCrary

R. A. Thomas- --

i J. A. Bailey ,

O. Batum '

i-D. E. Dutton

K. M Gillespie i E. D. Groover l- L. T. Gucwa

, B. L. Lex C. R. Miles, Jr.

H. C. Nix i R. W. Staffa 4

'J. L. Vota i

I I

f I

i i

l i

i i

L

_ - . . _ . _ . _ . _ _ . _ _ _ _ _ - . . _ _ _ . . . _ _ . _ . _ . _ . _ _ _ . . _ _ . _ . _ . . _ . _ , _ . _ . . _ . _ - . . _ . _ . _ _ .