ML20010J002

From kanterella
Jump to navigation Jump to search
Responds to 810805 Request Re Generic Issue B-24 & TMI Action Plan II.E.4.2.5.Util Will Submit Design & Modified Containment Vent & Purge Sys for Unit 2 by 811001.Unit 1 Tech Specs Provided 810528
ML20010J002
Person / Time
Site: Farley  
Issue date: 09/23/1981
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
REF-GTECI-B-24, REF-GTECI-ES, RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.2, TASK-B-24, TASK-OR, TASK-TM NUDOCS 8109290488
Download: ML20010J002 (2)


Text

'

Mniling Addrx' s Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

0%%%Wg "'

Alabama Power e

tre soutnero cwirc sniem September 23, 1981 Docket No. 50-348 kAg8 Director, Nuclear Reactor Regulation

!pd % g k g Ag(

U. S. Nuclear Regulatory Commission J

Washington, D. C. 20555 Attention: Mr. S. A. Varga 7

/

Completion of Generic Item B-24 and W

TMI Action Item II.E.4.2.5 Gentlemen:

Your letter of August 5,1981 requested Alabama Power Company to prepose Technical Specifications consistent with the resolution of Generic Item B-24 and TMI Action Item II.E.4.2.5.

In particular, Technical Specifications were requested for items 2 (Valve Operability) and 4 (Containment Leakage Due to Seal Deterioration). Technical Specifications for these items on the currently installed 48 inch purge valves and 18 inch purge valves were proposed to the NRC in the Alabama Power Company letter dated May 28, 1981 as part of the Unit 1 Technical Specification upgrade.

In addition, the May 28, 1981 submittal also included a revised minimum containment isolation setpoint which is consistent with the resolution of item 5 (Containment Pressure Setpoint for Containment Isolation).

As part of the Unit 2 full power NPF-8 license condition 2.C.17 Alabama Power Company will be submitting by October 1, 1981, the design of the modified containment vent and purge system.

Prior to instal-lation of the 8 inch purge valves, Alabama Power Company will propose revised Technical Specifications for the containment purge system.

If you have any questions, please advise.

Yours very truly,

'k [

F.L.Clayton,(r.

FLCJr/ JAR:wm Oh cc: See Page 2 Il 4 I b i

8109290488 810923 D DR ADOCK 05000348 PDR

L Director, Nuclear Reactor Regulation ~

September 23, 1981 U. S. Nuclear Regulatory Comission Page 2 i

cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly l

Mr. E. A. Reeves Mr. W. H. Bradford k

6 7

1 i

l l

I i

l t

.~

,..._,,_.-.,-.m.._..-,_

.. -