ML20010H873

From kanterella
Jump to navigation Jump to search
Forwards LER 81-048/03L-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML20010H873


LER 81-048/03L-0:on 810808 & 25 Loop 1 Prestressed Concrete Reactor Vessel Cooling Water Outlet Temp Exceeded 120 F Due to Failure of Temp Controller.Caused by Cold Solder Joint & Failure of Transistor in Output Circuit,Respectively
ML20010H882
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/04/1981
From: Mcbride M
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20010H882 (1)
Forwards LER 81-048/03L-0.Detailed Event Analysis Encl
ML20010H872
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/04/1981
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20010H872 (4)