ML20010H797

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 81-063/03X-1
Date released: 01/24/2020 Download: ML20010H797


Updated LER 81-063/03X-1:on 810808,while at 100% Power Reactor Trip Breaker B Failed to Open When High Pressurizer Pressure Signal Was Simulated.Caused by Failure of Metal Latch in Undervoltage Trip Attachment.Attachment Replaced
ML20010H806
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/16/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010H806 (2)
Forwards Updated LER 81-063/03X-1
ML20010H796
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/16/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010H796 (1)