Forwards Corrected Tech Specs Re Reactor Bldg Cooler Surveillance & Svc Water Chlorination Procedures,Originally Submitted in 810130 Ltr
ML20010H772
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/22/1981
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: Clark R, Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20010H773 List:
References
0CAN098109, CAN98109, NUDOCS 8109290282
Download: ML20010H772 (3)


Text

.

l ARKANSAS POWER & LIGHT COMPANY FIRST NATIONAL BUILDING /P.O. BOX 551/LITTLE ROCK, ARKANSAS 722o3/(501) 371-4422 September 22, 1981 WILLIAM CAVANAUGH, lil Senior V:ce President Energy Supply 0CAN098109 g N Ll i%',

O% $

Director of Nuclear Reactor Regulation ATTN: Mr. Robert A. Clark, Chief f9 m 't

,o c2

?-'1 j -

Operating Reactors Branch #3 Division of Licensing y}

\g

% f, W

j ;-

ff U. S. Nuclear Regulatory Commission 'e <g+q,g",g  ;

Washington, D. C. 20555 b ,

\ /iL Director of Nuclear Reactor Regulation b ATTN: Mr. J. F. Stolz, Chief Light Water Reactors Branch #1 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Arkansas Nuclear One - Units 1 an 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Proposed Technical Specifications on Reactor Building Cooler Surveillance and Service Water Chlorination Procedures (File: 1151.1, 2-1151.1)

Gentlemen:

In our proposed Technical Specifications submitted in our January 30, 1981 letter, the term " hot standby" was used when " hot shutdown" was the proper term. Also, there was an inconsistency in the reouired time for shutdown of the reactor in the case of inoperable cooling units or sprny systems. Specifically, in section 3.3.7.D, if two cooler groups were inoperable both of them must be in an operable status within 7 days or be -

in hot shutdown; however, in section 3.3.7.F, if a cooler unit fan is inoperable the cooling unit must be operable within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This is a more restrictive requirement for a less severe condition. [ool 1

The attached Technical Specifications correct these oversights for ANO-1 /

// l and also correct a similar inconsistency in time limits for ANO-2.

wkd:

booo r: O "109290202 0109

[:PDRADOCK05000h w

pDR MEMEiER MlOOLE SOUTH UTILITIES SYSTEM

2 No fee is remitted fer Unit 1 as this Technical Sr .ci* ir- .on is still under review.

However, pursuant to the requirement of 10 CFR 170.22, we have determined I the Unit 2 request to be a Class III Amendment as it is a sii;gle safety issue. Accordingly, a check in the amount of $4,000 is remitted.

Ve y truly yours,

/t William Ca augh III WC:MCS: s1 Y%

Attachments i

i i

i I

l I

'~

t

d. -

i r g -- , -nn--- e -

, , , , < , - , . , , . , ,,,,,,,r,, ,--n v, --, , - , -ne, . , , . . , , , - .---~,-e a----

STATE OF ARKANSAS )

) SS COUflTY OF PULASKI )

I, William Cavanaugh, III, being duly sworn, subscribe to and say that I am Senior Vice President of Energy Supply, for Arkansas Power &

Light Company; that I have full authority to execute this oath; that I have read the foregoing document number 0CAN098109 ano know the contents thereof; and that to the best of my knowledge, information and belief the statements in it are true.

,f WilliamCpnaugh,II SUBSCRIBED AND TWORN T0 before me, a Notary Public in and for the County and State aMve named, this 2f day of S whbJW ,

1981 M "~

9t6tary'Public i My Commission Expires:

/ > - >O- P V

.~