ILLINOIS POWER COMPANY fy 73 zg9_ggy_g 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525
/r w
@\\19e/in September 25, 1981 N
{' f'.
p
'h Mr. James R. Miller, Chief
.bT>
Standardization & Special Projects Branch Division of Licensing 0) 1.,
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 4'
1L' Washington, D. C.
20555
~
Dear Mr. Miller:
Clinton Power Station Unit 1 Docket No. 50-461
SUBJECT:
QA Program Applicability to Safety-Related Masonry Walls This is in response to a request made of H.
B. Perkins of 7111nois Power by D. C. Jeng of the NRC Structural Engineering Breach (SEB) during the NRC Structural Audit conducted at Sargent & Lundy offices on September 15-18, 1981.
A quality assurance program which meets the applicable criteria of 10CFR50 Appendix B has been and will continue to be applied to the design and construction of safety-related masonry walls at CPS.
Masonry block walls have been added as Item XXXV. 15 of Table 3.2-1 of the CPS FSAR as part of Amendment 7 which will be submitted by September 30, 1981.
If additional information is required, or if I can be of further assistance, please advise.
Sincerely, l
E do G. E. Wuller Supervisor-Licensing Nuclear Station Engineering-GEW/lt cc:
H. H. Livermore, NRC Resident Inspector J. H. Williams, NRC Clinton Proj ect Manager D. C. Jeng, NRC Structural Engr. Branch N. Chokshi, NRC Structural Engr. Branch
/> 8 1 0 9 2 9 0 2 5 5 8 1 0 9 2 5
' PDR ADOCK 05000461
- A PD2 s-
. -