ML20010H678

From kanterella
Jump to navigation Jump to search
Mod 4,extending Period of Performance Through 820601 & Allowing for Partial Payments Under Contract,To Statistical Analysis Study
ML20010H678
Person / Time
Issue date: 09/14/1981
From: Lebo C, Wolfbein S
NRC OFFICE OF ADMINISTRATION (ADM), WOLFBEIN, S.L.
To:
Shared Package
ML20010H677 List:
References
CON-NRC-10-80-694 NUDOCS 8109290088
Download: ML20010H678 (2)


Text

- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _. _ _ _ _ _

~

a 5%A.o tem ae, mT i9e6 ret : cn i.ON AMENDMENT OF SOLICITAT.ON/ MODIFICATION OF CONTRACT I

Gi,.i,. At S t e vict s AD.,~,Stu.. i oi

.< D. poc.

.G. m Cm 3-i

1. u te.DwlN1/mODitCATC N NO.

2 EFFtCTWI Daft

3. 8tOUl5f10N/PVeCM&51 ef outst >'O.
d. PkOJE CT NO (If.sp/s,.hle, f

FOUR 39/02/81 RFPA No. ADM-80-694 3 155'.tD er CODE

e. ADusNrsiteID ST (If eece rA.m && 3)

(ODE l U.S. NUCLEAR REGULATORY COMMISSION Division of Contracts Washington, DC 20555

7. CONTaAC10e CODE [

j FAClLIT)' CODE l S.

Namt AND ADDet55 AMf NDMINT OF SoliciTATCH LO.

DattD rs,, m a,;

SEYMOUR L. WOLFBEIN

<5,,,.,,,,.

E 706 Parktown Du m'CAfiON OF^cT/O'Dia

~O. NRC-10-80-694 740DiFi

' = ' '. " "

er/ ZIP C.s, /

220 Benjamin Franklin Parkway

{ Philadelphia, PA 19130

_.]

06/12/80 (3, w,,,,

Daf tD

9. TM11 SLOCK APPLit. ONLY TO AmENDa*ENT5 OF 50LICITATICW5 0 r~.

6 - e. - ' - ad 6-i'.

'h'.-

~e

-'-d' oa-

-. ~ ~ -

O.. ~...a =~e...,-.., s.....a~a,,,. *. h.-.a de...~.r.a

n..s <
w. 6, - s

.s.

a.,

m.,...a.a..a,e

.... a *...~~~~m.,.a

.ied..

.-e

. * *..........a..h..., s.h....... b.a a ;.. m e r...... i.a.,

.e i e....

.h.ch.aci.en..elerea.e c th..

3.s...

a.ad.a.ead a.ae avmb.e.. F AILutt Of YOUR ACKNowtEDGimtetf 10 at etttivgD AT Tw! 155UtNG CPfict pelot TO Twt MOUn AND DATE SPEC 181tD MAY etSULT lN REltCTION OF Tout OFf f et 1f, by..e.

s *... mead =w y on... v. eaag..a e#.e.ir..d r..,b=.aed..vch cheap. m.y be a d. by les.

.ete

.e,pr... sed.wch w..g.

6eae e.bn e.v.ac. *. me lg c a.ad me.=.ad=em..ad. eu...d p

.e eie.p.a.ag h.- one..*e pecJ d a

IC. ACCOUNTING AND APPeOPs;ATON DAT A (1/ regen, red)

NOT APPLICABLE.

II. TMis 860CK APPtits ONLY 10 MODePICATONS 08 CONTRACT 5/ Osot:5 (cs)

Th.. Ch. age Oede, is.

d ove.

at e.

The Ch. ape..et ew..a bl d 12.ee m de the.b av abe d c.**.ct/.ed...

m ne.b. =

e..a.-.a /..d.,.. -a e. d...*.o *. a...-.-. ci

. i o.. < >. c..a r..me..... a

.. e<. i. e.

  • bi.a 12.

THE MOTUAL AGREEMENT 0F BOTH PARTTFC; m @ n.

5.,,,i...

i. A....~- ;. e..

i.

de... m.

6... a..b..a.....

.e. o. 6a bw i r.

12. DESCaiPirON Op utNDant NT / woDIFICAT CN The purpose of this Supplemental Agreement is to extend the period of performance from September 1,1981 to June 1,1982 and provide for partial payments under the contract.

Therefore, the following changes are hereby incorporated:

1.

Under Article III - Period of Performance, delete A in its entirety and substitute the following in lieu thereof:

"The period of performance shall commence on the effective date of this contract and shall not extend beyond June 1,1982."

II.

Under Article III - Period of Performance, delete the last sentence in B, Option to Extend the Term cf the Contract, and substitute the following in lieu thereof:

"The period of performance, including the exercise of this option, shall not extend beyond June 1,1982."

01092900as a10934 PDR CONTR NRC-10-80-694 PDR p

t m, o. da

..a..n.....d..a..

a. s.. d -.....-.a

, 6%....

.a.

.a

,a. d.

,n

. d e.

CONTt ACT R/OF eon NOT etouteED CONTRACTOa/OstteOR 15 stoUiaro TO 5 N TM ME AND RI COPi[5 TO l$50pNG oft.C1

/

la N AMI Of C ACTOt / F E *On

17. UNf'tD'51Aits OF d04 AuthPi t

'r n

,,,a.N..._.m...,

o

,,..a -. _._ ~

l3.N Wl ANDTIIL! Of 5DGN(e (7ppe.c ef)

16. DATt 5IGN(D 1 $, N AME Of CONT 5 ACTING O.f etta ( 7y/.c u prearj
19. DATE seGNED ffffi et L L~ YY bl 9 h g7

]

s.

C# WM--____ __

f B0

I'II. Under Article V - Consideration, add the following to Section~ A. -

"The contractor may submit invoices for partial payment in accordance with the following schedule:

1.

Following the completion of Tasks 1-3 described in the Statement of Work the contractor will provide the project officer and/or his designee (s) with a formal oral briefing in which he will address the adequacy of the data supplied to him by NRC, identify the need for additional infonnation, identify problems, if any, with the extraction of data or computer file format, and outline specifically the type of analysis he intends to perform.

Upon delivering this briefing, which must be acceptable to the prc. ject officer, the contractor may invoice NRC for the sum of $12,000.00.

2.

After the NRC has supplied the additional information or remedied problems identified in the briefing referred to in 1. above, the contractor-will deliver a second formal oral briefing to the project officer. and/or his designee (s) to provide a preliminary analysis of the information supplied, identify additional. coding problems, if any, identify. additional.information necessary to perform analysis of the data and outline specifically a proposed-approach to performing a final analysis of the data.

Upon delivering this briefing which must be acceptable to the project officer, the contractor may invoice NRC for the sum of $8,000.00.

3.

The contractor will provide the project officer and/or his designee (s) with a final briefing, setting forth a complete analysis as described in Task 4 of the Statement of Work.

If so directed by the project officer, the contractor will prepare a written report of his final analysis.

Following such final briefing and/or submission of written report, the contractor will assist the project officer during the discovery l/

period as described in Task 5 of the Statement of Work.

If the briefing / report is acceptable to the project officer and the contractor performs the consulting services described in Task 5, at the conclusion of the discovery period of the litigation, the contractor may invoice NRC for the sum of $8,500.00."

S S

6 em