Text
r o%
G,vra a Puer Cervaw 3 D P coman! Aseue AV!a Gm < a 30308 TN ;A +- 404 526 70.O UJ ! ng A&: ss
+1
,.. b,.,,
i',
Pc t ONe Bcm 4545
.J
i E."
b N wa Geoma 30302
~~
Georgia Power Y
A I 3l P 2. O J ~ ~~ ~"""
J. T. Beckham. Jr.
V ce Pres ced and Gerew thnaaer Nuclear GencraScn
,Y
/dk i,
4
' t. N mP 3
I United States Nuclear Regulatory Connission
./N h3 h 1
Office of Inspection and Enforcement
REFERENCE:
Region II - Suite 3100 RII: JP0
!E !
.h h j i
6 r
101 11arietta Street, NU 50/321/50-366 C hg(7,f Atlanta, Georgia 30303 I&E Bulletin 81;,01
\\uf
-?
ATTENTI0!1: tir. Janes P. O'Reilly O
N d
Qf\\
Gentlenen:
Georgia Power Company submits the following infomation in response to Iten 4 of ISE Bulletin 81-01,
" Surveillance of flechanical Snubbers,"
transmitted by your letter dated January 27, 1981.
This information subnittal completes all necessary actions required by Georgia Power to comply with the requirements of the subject bulletin.
Responses to bulletin itens 1-3 and 1-4 for Hatch Units ' and 2, respectively, were subnitted to you previously by our letter dated 11 arch 13,1981.
Because of prcblems identified during flay, 1980, all International fluclear Safeguards Corp. (IllC) nechanical snubbers have been replaced with Pacific Scientific Company (PSA) nechanical snubbers per Design Change Requeste 80-15 and 80-16 for Units 1 and 2, respectively.
INC nechanical snubbers are no longer utilized at the Hatch plant.
A partial replacement of Unit 1 inaccessible IHC nechanical snubbers with PSA snubbers was perforned during June, 1980.
The replacement PSA snubbers were visually inspected and nanually tested during installation, lione of the snubbers failed the required testing. Although it was stated in our initial response to the bulletin that those replacement snubbers would be re-exanined during the Spring 1981 naintenance/ refueling outage, review of the bulletin requirenents indicated re-exanination would not be necessary based on bulletin iten 3.c.
Replacenent of the remaining Unit 1 inaccessible IHC nechanical snubbers was conpleted during the Spring 1981 naintenance/ refueling outage.
The new PSA snubbers installed during this outage were visually inspected and nanually tested during installation.
Hone of the snubbers failed the required testing.
1 Repl acenent and test results of Unit 1 access 1ble snubbers were addressed in our fiarch 13, 1981 letter.
g,II S
}
B10'/240250 810731 PDR ADOCK 05000321 0
r
~
)
. a.
Georgia Pbwer b U. S. fluclear Regulatory Connission Offico of Inspection and Enforcenent Region II July 31,1981 Page Two All Unit 1 PSA nechanical snubbers installed as a result of Design Change Request 80-15 were satisfactorily tested.
There tiere a total of sixty (60) safety-related accessible and inaccessible PSA nechanical snubbers installed consisting of four (4) PSA-3 ( size 6 kips) and fifty-six (56) PSA-1 (size - 1.5 kips) snubbers.
Visual inspections were performed to check anchor bolt configuration, wel ds, pir-to-pin diaensions and to assure proper installation and clearance.
Manual testing assured nechanical operability by renoving one end of the snubber and noving the snubber through one full stroke in both tension and conpression.
Information regarding Unit 2 nechanical snubber replacenent and testing was supplieri to you previously by our letter dated llarch 13, 1981.
If you have any questions in this regard, please contact this office.
J. T. Beckhan, Jr. states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Conpany, and that to the best of his knowledge and belief the facts set forth in this letter are true.
GEORGIA P0 HEP, C0!1 pally Ry: h h y J. T. Beckhan, Jr.
Sworn to and subscribed before ne this 31st day of July,1981.
MC Hotary Public g
Notary Public, Georgia, State at Large AE/nb My Commission Expires Sept 20,1983 xc: II. Manry R. F. Rogers, III