ML20010G807

From kanterella
Jump to navigation Jump to search
Forwards LER 81-039/03L-0
Date released: 01/24/2020 Download: ML20010G807


LER 81-039/03L-0:on 810817,during Normal Operation,Turbine First Stage Permissive Switch 3-PS-1-81A Found 3% Above Tech Spec Limit.Caused by Barksdale Bourdon Tube Pressure Switch B2T-A-12SS Setpoint Drift.Switch Reset
ML20010G816
Person / Time
Site: Browns Ferry 
Issue date: 09/14/1981
From: Holder G
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G816 (6)
Forwards LER 81-039/03L-0
ML20010G806
Person / Time
Site: Browns Ferry 
Issue date: 09/14/1981
From: Green H
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G806 (1)