ML20010G735

From kanterella
Jump to navigation Jump to search
Forwards LER 81-078/03L-0
Date released: 01/24/2020 Download: ML20010G735


LER 81-078/03L-0:on 810820,reactor Core Isolation Cooling Flow Controller Demand Was at Less than 100% While in Either Auto or Manual.Caused by Faulty Resistor in Ramp Generator. Units Replaced
ML20010G738
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/10/1981
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G738 (2)
Forwards LER 81-078/03L-0
ML20010G734
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/10/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G734 (1)