ML20010G716

From kanterella
Jump to navigation Jump to search
Forwards LER 81-089/03L-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML20010G716


LER 81-089/03L-0:on 810817,discovered Linkage Between Trip Mechanism & Trip Valve Loose During Wear & Alignment Check on Auxiliary Feedwater Pump 23.Caused by Bolts Which Became Loose Through Normal Vibration.Bolts Tightened
ML20010G718
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/14/1981
From: Dickey F
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20010G718 (1)
Forwards LER 81-089/03L-0.Detailed Event Analysis Encl
ML20010G715
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/14/1981
From: Midura H
Public Service Enterprise Group
To: HAYNES R C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20010G715 (1)