ML20010G586

From kanterella
Jump to navigation Jump to search
First Interim Deficiency Rept Re Possible Failure of GE & Util to Comply W/Reporting Regulations of 10CFR50.55(e), Initially Reported on 810810.GE Is Evaluating Deficiency to Determine Necessary Corrective Actions.Next Rept by 811109
ML20010G586
Person / Time
Site: Hartsville, Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 09/09/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8109220256
Download: ML20010G586 (2)


Text

_ _- __ - _____

TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEC 37401 400 Chestnut Street Tower II September 9, 1981 HTRD-50-518/81-20, -519/81-16, l

-520/81-18, -521/81-16 {

PBRD-50-553 /81 -21, -554/81-15 ,

Q (f IV Mr. James P. O'Reilly, Director c' t t>L ./ f ) Itc\ ,

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 2} SEP 2 21981- 3 I' Region II - Suite 3100 C " ' 'cdWiim ", ;) 7 _

101 Marietta Street N O g l Atlanta, Georgia 30303 \ g .-

.s /3-: L \U '

cA c.

Dear Mr. O'Reilly:

C HARTSVILLE AND PHIPPS BEND NUCLEAR PLANTS - GE SUPPORT OF 10 CFR -

PART 50.55(e) REPORTING - HTRD-50-518/81-20, -519/81-16, -520/81-18,

-521/81 PBRD-50-553 /81-21, -554/81-15 The subject deficiency was initially reported to NRC-0IE, Region II, Inspector P. A. Taylor on August 10, 1981 as NCR's HTN QAB 8101 and PBN OAB 8101. In accordance with paragraph 50.55(e) of 10 CFR Part 50, we are enclosing the first interim report on the subject deficiency. TVA anticipates transmitting the next report on or before November 9, 1981. If you have any questions, please call Jim Domer at FTS 857-2014.

Very truly yours, TENNESSEE VALLEY AUTHORITY 7

. M. M111s, M< nager Nuclear Regulation and Safety Enclosure cc: Mr. Victor Stello, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Th J

,b 8109220256 810909 PDR ADOCK 05000538 S PDR An Equal Opportunity Employer

ENCLOSURE HARTSVILLE AND PHIPPS BEND MUCLEAR PLANTS GE SUPPORT OF 10CFR50.55(e) REPor. RING HTRD-50-518 /81-20, -510/81-16, ~520/81-18, -521/81-16 PBRD-50-553/81-21, -554/81-15 .

10 CFR PART 50.55(e)

REPORT NO. 1 (INTERIM)

Description of Deficier;Z This noncor.formance concerns the possible failure of TVA to comolv with the reporting regulations of 10 CFR 50.55(e). General Electric (GE) has not been advising TVA of GE-initiated potentially reportable conditions (PRC's) or of GE- or C. F. Braun-initiated STRIDE Design Deficiency Reports (SDDR's). GE has not been evaluating these PRC's and SDDR's for reportability in ac ordance with 10 CFR 50.55(e). GE is contractually obligated to evaluate PRC's for 10 CFR 50.55(e) applicability and had previously agreed to advise TVA of all C. F. Braun- or GE-discovered nonconforming conditions (PRC's or SDDR's). This deficiency originated fren a TVA quality assurance audit (audit No. 81V-18) held at General Electric in San Jose, California.

Interim Procress GE is in the process of evaluating this deficiency to determine the necessary corrective action (s) in order for TVA to comply with 10 CFR 50.55(e). TVA is continuing the investigation of this matter and will submit a second report on or before November 9, 1981.

'eW+44mh wm -

  • v w am , ..e. ee e e A , ..w-, . a% v 4.e=< .A..m-=4*-. -+44 -

a.%. e.m .

  • Nw- m a .m 4

I. .

1. w ._ _- .

_ _ . _ . _ _ . _ _. _ ._. .-._, _. - . . . .