ML20010G183
| ML20010G183 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/19/1981 |
| From: | Aswell D LOUISIANA POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3K-81-0298, NUDOCS 8109150412 | |
| Download: ML20010G183 (1) | |
Text
c
.co.snd Dmg I
l.0UISIANA P O W E R & L i G H T! P O BOX 6008
- u2 octAnoNoe Srnur NEW OnLEANS. LOUISIANA 70174 * (504) 366 2345 M:OOLE SOUTH UT!LITIES SYSTEM August 19, 1981 o easwru.
v,c. pr..o.,s.pe.., % u ten W3K-81-0298 0-3-A35.07 A-3-A35.02.01 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Q,
)[\\
Office of Inspection and Enforcement
,f Q
611 Ryan Plaza Drive, Suite 1000
,q Arlington, Texas 76012 If-
- )
v Y'.
'. b_
, h k')
f7
SUBJECT:
Waterford SES Unit No. 3 N. S Docket No. 50-382of Potentially Reportable Incident No. M;L cf gw Interim Report
" Flammability of Cable Pulling Compound"
\\ C) 7 M
4 A
d 4
REFERENCE:
(1) Telecon - L. L. Bass (LP&L QA) to W. Hubacek (NRC) on July 30, 1981 (2) Telecon - L. L. Bass (LP&L QA) to W. Hubacek (NRC) on August 19, 1981
Dear Mr. Seyfrit:
As discussed in the Reference (2) telecon, the evaluation of the significance of Pctentially Reportable Incident #48, " Flammability of Cable Pulling Compound",
has not been completed at this time.
Tests concerning the solubility of the product are in process and will be completed by September 1, 1981.
The Engineering evaluation will be completed after test results are obtained.
Based on the above status, a final re, ort will be issued by September 21, 1981.
Yours very truly, D. L. Aswell
%h DLA:LLB:smd S
I
~
,. f k!9[
cc:
- 1) Director 4
- L/
Office of Inspection & Enforcement i
/ k 2{jbl U. S. Nuclear Regulatory Commission
/
Washington, D. C. 20555
- 2) Director Office of Management Information and Program Control
~
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8109150412 810819 PDR ADOCK 05000382 S