Text
lb Ulf 50s500
/
I LOUISIANA 24a OnAnoNoE Srnm POWER & L1GHT P O BOX 6008 = NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 UT5uE'S IYS August 25, 1981
,,QC W3K81-0300 Q-3-A35.07 Q-3-A35.02.01 Mr. K. V. Seyfrit, Director, Region IV
'g
% g *}p,i U. S. Nuclear Regulatory Commission j-gg Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 d-Q k
S (g8 Arlington, Texas 76012 b
sp y.N
SUBJECT:
Waterford SES Unit 3 J
Interim Report of Potential Reportable k \\
>g be x
incident #49 " Material Properties of M ' /'
/M
. I I D*
Tubc Track and Welded Fittings"
Reference:
(1) Telcon, L. L. Bass (LP&L) to B. Hubacek (NRC) on 7/22/81 (2) Telcon, L. L. Bass (LP&L) to B. Hubacek (NRC) on 8/21/81
Dear Mr. Seyfrit:
As discussed in the Reference (2) telecon, the evaluation of the significance of PRI #49 " Material Properties of Tube Track and Welded Fittings" has not been completed at this time.
The engineering evaluation of material certificates by Ebasco New York has not been completed.
It is estimated that this evaluation will be completed by September 1, 1981.
Based on the above status, a final report will be submitted by September 23, 1981.
Yours very truly, dNY D. L. Aswell DLA/LLB/grf cc:
- 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission hN Washington, D. C. 20555 y
- 2) Director
/O Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8109150403 810Ba PDR ADOCK 05000382 S