Final Potential Deficiency Rept Re Lack of Appropriate Quality Class I Coating Procedures for Work Inside Containment Under Contract 215,originally Reported on 810715.Deficiency Not Reportable Under 10CFR50.55e
ML20010F850
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/01/1981
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, GO2-81-0260, GO2-81-260, NUDOCS 8109110455
Download: ML20010F850 (2)


Text

r-

%C 50.55(e) Report Docket No. 50-397 Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 September 1,1981 G02-81 -0260 R

h i8 E

l. 58 Docket No. 50-397 d ;p, a
.5 o Mr. R. H. Engelken w U. S. Nuclear Regulatory Commission _

Region V -

Suite 202, Walnut Creek Plaza 1990 North California Boulevard Walnut Creek, California 94596

,99 s7# d ".'dr ' q,

Dear Mr. Engelken:

[ ., ' N y9@[7'["9.

Subject:

TT SUPPLY SYSTEM NUCLEAR PROJECT N0. 2 ,

P0TENTIALLY REPORTABLE DEFICIENCY ,do 10CFR50.55(e) #134 Q g3 $

CONTRACT 215 C0ATING .@

Reference:

Letter G02-81-0180, dated July 15, 1981, r$b/ J'Q/

R. G. Matlock, Supply System to R. H. Engelken, NRC The reference transn Itted an interim report describing a potentially reportable deficiency under 10CFR50.55(e) relating to the lack of appropriate Quality Class I coating procedures for work inside con-tainment under Contract 215.

The interim report stated that a failure of the coating system could result in paint becoming detached and then deposited in the suppression pool where it could plug ECCS suction strainers. In addition, it was stated that the failed coating could hamper proper drainage, plug access to downcomers, and increase contamination levels in the water.

The purpose of this letter is to advise you that the Supply System has determined this deficiency to be not reportable under 10CFR50.55(e).

It is unlikely that sufficient quantities of paint would flake off to adversely affect safety systems. Corrective action has been taken

/>

JG 7

S I O 8109110455 810901 PDR ADOCK 05000397 S pop TNWj

e P kE Washington Public Power Supply System RH Engelken Page 2 where coating application does not physically meet specification requirements. This action entails repainting the components to ANSI standards.

Very truly yours, R G. Matlock Program Director, WNP-2 RGM:EAF:cph cc: WS Chin - BPA ND Lewis - EFSEC, Olympia TA Mangelsdorf - Bechtel 982 RE Snaith - Burns & Roe, N.Y.

V. Stello - NRC AD Toth - NRC Resident Inspector E. Wood - NRC WNP-2 Files l