Requests Extension of 810906 Deadline for Submittal of Addl Info Requested in NRC 810608 Ltr Re Environ Qualification of safety-related Electrical Equipment.Info Will Be Submitted by 811015
ML20010F842
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/08/1981
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
IEB-79-01B, IEB-79-1B, JPN-81-66, NUDOCS 8109110436
Download: ML20010F842 (2)


Text

. . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

1 h - .

POWER AUTHORITY OF THE STATE OF NEW YORK to CoLUMeus CIRCLE NEW YORK N. Y.10019 L212) 397.6200 G E0",G,E,,Tg s E,R R cw,s y r OPtsaTINe OFrican TRtJSTEES '

f f JOHN W. BOSTON JOHN S DYSON ,\

P ses ta o arcton OF POWER OPERATIONS GEOMGE L. ING ALLS viCE cuainesAN f~ y' JOSEPH R. SCHMIEDER snacutiva vica Of. f ESIDENT 4 CMifF RICH ARD M. FLYNN ,

ROBERTI MILLONZI u D ~ LEROY W. SINCLAIR FREDEntCK R. CLARIC O C EP F1 AhC AL cPricam

  • D y THOM AS R FREY
  • $ e eth RAL counesk

.%d(IM(\-

September 8, 1981 JPN-81-66 Director of Nuclear Beactor Regulati0n U.S. tbclear Regulatory Chanission Washington, D.C. 20555 Attention: Mr. Thonus Ippolito, Chief Operating Ibectors Branch No. 2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket Ib. 50-333 Environmental Qualification of Safety-Iblated Electrical HIuipment

Reference:

Iatter T.A. Ippolito (NRC) to G.T. Berry (PASNY) dated June 8, 1981.

Dear Sir:

Tne referenced letter transmitted the Safety Evaluation for the Environmental Qualification of Safety-related Electrical Bluipnent installed at the FitzPatrick plant, ard requested the subnission of additional information by September 6, 1981. The Power Authority requests that tnis date be changed to allow nore time to obtain and compile the requested information.

The requested extension is necessary due to the following:

1. Extension of the scope of the response to the Safety Evaluation and the increase in the level of justification required bf the NRC staff, which the NRC made known during tne July 7 - 10 nneting in Bethesda.
2. Consideration of the clarifications provided by the NRC staff during the same meeting. g s

/ O 8109110436 810908 PDR ADOCK 05000333 P POR

f

3. Delays encountered by the Authority in obtaining qualification information aM in identifying suitable gaalified replacement equipment.
4. Tne Power Authority's efforts to corduct an extensive j analysis to determine the functional requirements aM operating times of all of tne components identified in the

' original submittal, ard to incorporate this information into cG:.ponent evaluation sneets to be provided to the NRC.

'Ibe analysis identified in item 4 above nas been completed. The effort to hcorporate the results of this analysis into revisions to the component evaluation sheets is in progress at this time.

'Ihe Power Authori'cy intends to suunit a response to the referenced letter, as clarified during the Bethesda meeting, by October 15, 1981.

Should you have any questions, please contact us.

- Very truly yours, J. D nior Vice President M.1 clear Generation cc: Mr. J. Linville Resident Inspector P. O. Box 41