Forwards LER 81-102/01T-0
Date released: 01/24/2020 Download: ML20010F755


LER 81-102/01T-0:on 810824,discovered That,In Accident Analysis of Containment Pressure Response,During Design Basis Events,Component Cooling Water Heat Exchanger Was Incorrectly Modeled.Caused by Incorrect Original Input