Category:CORRESPONDENCE-LETTERS
MONTHYEARML20080S6061983-10-11011 October 1983 Requests Info Re NRC Costs for Withdrawing CP Application, Per .Extension of Due Date for Payment of 830913 Invoice Requested ML20054B9031982-04-12012 April 1982 Forwards State of or Energy Facility Siting Council 820409 Order Dismissing Application for Site Certificate & Public Util Commission 820408 Order Directing Util to Write Off Financial Investment in Plant ML20052A3451982-04-0808 April 1982 Requests to Make Limited Appearance Statement at 820420 Hearings ML20054A6321982-04-0707 April 1982 Forwards NRC Testimony in Proceeding.Ten Copies Will Be Provided to Reporter at 820420-23 Hearing in Portland,Or ML20054A6441982-04-0606 April 1982 Forwards 10CFR2,50 & 51,in Response to 820405 Request.W/O Encl ML20042C5361982-03-30030 March 1982 Corrects Error in RB Eastvedt 820318 Testimony ML20042A4081982-03-18018 March 1982 Forwards RB Eastvedt,Ea Stull & DC Scalletti Testimony. Notice of Appearance in Proceeding Encl ML20040G6361982-02-0909 February 1982 Advies That Applicants 810129 Request for Clarification of ASLB 811023 Order & Statement of Position Being Reserved Due to Problem W/Earlier Svc ML20040E6161982-01-29029 January 1982 Forwards Amend to Application for CP & Amend 13 to PSAR ML20011A7151981-10-28028 October 1981 Forwards 810428 Stipulation Re NRC Position Opposing Consideration of Class 9 Accidents ML20031H5401981-10-22022 October 1981 Advises That Parties Informed by 811019 & 21 Telcons That ASLB Will Proceed to Hear Alternate Site Testimony. Intervenors Motion to Suspend Denied.Parties Agree to New ASLB Proposed Schedule ML20031F3931981-10-13013 October 1981 Requests Change of Address on Bellefonte Mailing Lists & Addition to Mailing Lists for Midland,North Anna 3,Pebble Springs & WPPSS 1 & 4 ML20031F3111981-10-0707 October 1981 Ack Receipt of Wj Lindblad Affidavit Re Intent to Proceed W/Project,& Util Response to Intervenor Motion for Suspension of Further Hearings.Response Will Be Submitted by 811014.Press Clippings Encl ML20010F7021981-09-0909 September 1981 Forwards Rl Gotchy & R Weller Affidavits Attesting to Authorized Testimony in NRC 781215 Response to Memorandum Concerning ASLB Questions.Nrc Will Move ASLB to Enter Affidavits & Testimony Into Record ML20009G9621981-07-29029 July 1981 Forwards NRC Answers to 810708 Forelaws on ASLB Interrogatories ML19347E6571981-05-12012 May 1981 Informs That NRC Does Not Object to Lk Marbet 810504 Request for Extension of Time to Submit Argument on Proposed Contention AS-5.Extension Would Not Impact on Hearing Schedule Re Alternative Sites ML20008G0801981-05-0404 May 1981 Requests That Submittal of Argument on Class 9 Be Timed 1- Wk Following ASLB Resolution of 810428 Order Requiring Investigation of Issues Described in Nucleonics Week ML20004F3611981-05-0101 May 1981 Forwards Stipulation on Contentions & Scheduling Mentioned in B Bordenick .Related Correspondence ML19350C9231981-04-0808 April 1981 Forwards to ASLB & Described Stipulation Requiring Signature.W/O Encl ML19350D2161981-04-0606 April 1981 Opposes Admission of Marbet Proposed Contention AS-5.No Genuine Issue Raised Requiring Resolution.Resolution of Contention Irrelevant Even If Established by Evidence. Contention Must Be Stricken as Matter of Law ML20003D5511981-03-26026 March 1981 Advises of Stipulation Re Intervenor Proposed Contentions on NRC Alternative Site Analysis & Discovery & Hearing Schedule.Stipulation Should Be Forwarded within Next Several Wks ML20037C8771981-02-27027 February 1981 Clarifies Intent of 810122 Motion for Suspension of Further Hearings & Findings of Fact & Conclusions of Law.Forelaws on Board Anticipates Reviewing & Supplementing Proposed Findings & Conclusions Filed 810213 ML20003B6821981-02-19019 February 1981 Requests That Corporate Contact Be Changed from Wj Lindblad to Bd Withers,Vice President-Nuclear ML19345F6561981-01-29029 January 1981 Forwards ACRS Re Review of near-term CP Application Requirements ML20083L3681981-01-21021 January 1981 Forwards Short & long-term OL & CP Review Schedules,In Response to 801216 Meeting W/Usgs.List of OL Plant Reviews for Which NRC Tentatively Plans to Seek USGS Assistance Is Provided ML19341A6461981-01-21021 January 1981 Advises That Util Is Unable to Firmly Identify New Applications & Requests for Review Planned by 831231,in Response to NRC 801205 Request.Consideration of Collateral Siting Effort W/States of Wa & or Is Under Review ML19345F6991981-01-0909 January 1981 Forwards IE Insp Rept 50-514/80-01 on 801118-19.No Noncompliance Noted ML19353A3981980-12-22022 December 1980 Responds to Re NRC Progress in Review of Cps,Use of Resources for Section 110 of NRC 1980 Authorization Act, Delay in Adjudicatory Proceedings & Lack of Coherent Regulatory Guidance.Related Documentation Encl ML19340D2341980-12-11011 December 1980 Responds to Re Util Desire to Continue W/Licensing Effort of Facility in Limited Fashion.Proposal to Proceed W/Limited Effort Accepted,But May Be Problem W/Time Allocation ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19338G4491980-10-22022 October 1980 Forwards Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision Re Environ & Site Suitability.Table of Contents Encl ML19344B5871980-10-15015 October 1980 Forwards 801015 Motion Requesting Extension Until 801022 for Filing of Applicant Proposed Findings of Fact ML19338F7951980-09-30030 September 1980 Expresses Desire to Proceed W/Const Licensing of Facility. NRC Has Not Committed Resources to Complete Application Re Environ & Site Suitability Issues.Certificate of Svc Encl ML19351D6041980-09-10010 September 1980 Comments on Proposed Rules 10CFR50 & 51 Re Statement of Interim Policy on Nuclear Power Plant Accident Considerations Under Nepa.Supports Commission Approach as Interim Guidance ML19354C3301980-07-25025 July 1980 Forwards Evacuation Time Estimates for Gilliam & Morrow Counties,Or & Klickitat County,Wa in Response to 800702 Request.Advises That NRC Responded to 791226 Request on 800404.Study Found No Unusual Evacuation Problem ML19318C9141980-05-28028 May 1980 FOIA Request from Atty General,State of Il for Documents Re NRC Decision to Issue Suppl to Final EIS for Facility ML19323C0391980-05-0505 May 1980 Requests Addl Info for Fes Re Preferred Transmission Option & Route to Load Ctrs & Load Ctrs Which Will Receive Planned Generation ML19323G1951980-04-25025 April 1980 Requests Opportunity to Provide Response to Two Orders Issued by ASLB in Proceeding within 30 Days ML19309F4911980-04-22022 April 1980 Informs That NRC Project Notice Was Assigned File Title & Number Final Suppl to Final Pebble Springs EIS, & Number 8004 4 960.Thirty-day Review Began 800422 ML19323E6521980-04-14014 April 1980 Concurs W/Nrc 800310 Ltr That All Issues Are Moot Except Site Suitability ML19344D7521980-04-10010 April 1980 Forwards Final Suppl 1 to FES,NUREG-75/025 & Related Fr Notice ML19330A9551980-04-0404 April 1980 Forwards Evacuation Time Estimates for Gilliam & Morrow Counties,Or & Klickitat County,Wa Per 791226 Request. Preliminary Study Revealed No Unusual Evacuation Problems ML19309E0741980-04-0404 April 1980 Responds to NRC 791226 Request for Info Re Evacuation Time Estimates Around Future Plants.Forwards Summary Rept, Evacuation Time Estimates for Gilliam & Morrow Counties, or & Klickitat County,Wa. ML19344D6401980-03-26026 March 1980 Forwards State of or Energy Facility Siting Council 800314 Order Suspending Further Proceedings in Site Certificate Application Until 810701.Certificate of Svc Encl ML19294C2701980-02-28028 February 1980 Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized ML19296D4311980-02-25025 February 1980 Notifies That Util Has No Comments on Usda Ltrs to NRC Re Alternative Plant Sites.Agrees W/Advisory Council on Historic Preservation & or Dept of Land Conservation & Development Comments to Nrc.Response to Doi 800118 Ltr Encl ML20126K8351980-02-15015 February 1980 Informs That Project Will Not Be Completed to Meet Late 1980 Energy Requirements But Will Be Rescheduled to Meet 1990 Requirements.Util Intends to Continue State & Federal Licensing Activities.W/Rept & Certificate of Svc ML19260C9061980-01-30030 January 1980 Discusses Completed Review of NRC Draft Suppl to Fes on Proposed Facility.Treatment of Alternative Sites Sufficient to Demonstrate Acceptability of Both Hanford Reservation & Pebble Springs.Draft Suppl Rated LO-1 ML19260E2261980-01-30030 January 1980 Notifies That Review of NRC Draft Suppl Fes Is Complete.Epa Does Not Object to Proposed Action & Finds Info Generally Adequate.Draft Suppl Rated LO-1 ML19257D5481980-01-28028 January 1980 Forwards Comments on NUREG-75/025,Suppl 1, Draft Suppl to Fes Re Const of Facility, Nov 1979 1983-10-11
[Table view] Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20054A6391982-04-0101 April 1982 Notification of 820407 Meeting W/Util in Bethesda,Md to Discuss Cp/Ml Rule Items & Unresolved Safety Issues ML20042C5361982-03-30030 March 1982 Corrects Error in RB Eastvedt 820318 Testimony ML20042A4081982-03-18018 March 1982 Forwards RB Eastvedt,Ea Stull & DC Scalletti Testimony. Notice of Appearance in Proceeding Encl ML20011A7151981-10-28028 October 1981 Forwards 810428 Stipulation Re NRC Position Opposing Consideration of Class 9 Accidents ML20010F7021981-09-0909 September 1981 Forwards Rl Gotchy & R Weller Affidavits Attesting to Authorized Testimony in NRC 781215 Response to Memorandum Concerning ASLB Questions.Nrc Will Move ASLB to Enter Affidavits & Testimony Into Record ML20009G9621981-07-29029 July 1981 Forwards NRC Answers to 810708 Forelaws on ASLB Interrogatories ML19347E6571981-05-12012 May 1981 Informs That NRC Does Not Object to Lk Marbet 810504 Request for Extension of Time to Submit Argument on Proposed Contention AS-5.Extension Would Not Impact on Hearing Schedule Re Alternative Sites ML19345G4791981-04-0202 April 1981 Notification of 810408 Meeting W/Utils in Bethesda,Md to Discuss NRC Activities & Plans for Review of near-term CP Plants Considering Proposed Rule on Licensing Requirements for Pending CP & Mfg License Applications ML20003D5511981-03-26026 March 1981 Advises of Stipulation Re Intervenor Proposed Contentions on NRC Alternative Site Analysis & Discovery & Hearing Schedule.Stipulation Should Be Forwarded within Next Several Wks ML20003C3751981-02-0909 February 1981 Forwards Projected Target Dates for Pending CP Applications. Schedule for CP Issuance Is Heavily Dependent on Scope of TMI-related Requirements ML20083L3481980-12-31031 December 1980 Forwards Action Plan for Resolution of non-TMI Issues for Pending Cp/Mfg License Applications,Per Ofc of Nuclear Reactor Regulation Approach to Resumption of Licensing. Safety Evaluation Inputs Should Be Provided by 810601 ML19256E4001979-09-20020 September 1979 Advises of Marbet Preference for Preliminary Telephone Conference ML19256E4081979-09-12012 September 1979 Forwards Vol 1 of Proposed Findings of Fact,Opinion, Conclusions & Order Re Whether Matl Received as Evidence Meets Energy Facility Siting Council Requirements.Exceptions Should Be Filed by 791005.Summary of Order Encl ML20204B9841978-10-27027 October 1978 Defers Filing Date for Testimony Re Liquid Radwaste Sys to 781103.Argonne National Lab Review Is Delayed.Will Inform Bd & Parties When New Filing Date Is Confirmed ML20037A1631978-10-11011 October 1978 Reviews Sser Input.Proposal Acceptable at CP Stage ML20147C1061978-09-29029 September 1978 Informs Bd of NRC Agenda for Filing Testimony on Open Items in the Matter of Pgecs Subj Facils ML20148A4591978-09-18018 September 1978 Submits Tentative Schedule on Economic Issues to Be Discussed at Facility Proceeding ML20148A4641978-09-14014 September 1978 Repts on Remaining Issues to Be Covered in Proceeding. Hearings on Economic Issues Will Begin on or About 780918. Site Certification Application Will Be Considered in May 1979 W/Decision Expected by Jul 1979 ML20040A6141978-05-15015 May 1978 Forwards Reactor Sys Branch Response to ASLB Question 6 Re Decay Heat Removal Sys ML20040A6041978-04-23023 April 1978 Forwards Reactors Sys Branch Supplemental SER Input for Resolution Items 6,10 & 11 on Passive Failure During long- Term Cooling,Feedwater Isolation & Chapter 15 long-term Operator Actions,Respectively ML20040A7081977-10-21021 October 1977 Forwards List of Open Issues on Facilities & B-SAR-205, Requiring Resolution Prior to CP Issuance.List of Items to Be Addressed at Final Design Stage Also Encl ML20210S7551977-02-0808 February 1977 Discusses Seismology Review Plan for Pacific Northwest Plants Under CP Review.Recommended Actions Summarized.Usgs Will Review Rept of 1872 Earthquake ML20214G6701977-02-0808 February 1977 Forwards Recommended Seismic Review Actions Needed to Resolve Licensing Decisions on Nuclear Plants in Pacific Northwest Under Review for Cps,Per Meeting on 770202 ML19329B6151975-08-27027 August 1975 Discusses Sept Blue Book.Explains Significant Delays ML20039G5081975-08-0707 August 1975 Forwards SER Input for Fuels Section,Nuclear Design Section & Accident Analysis Chapter ML20039H1231975-01-24024 January 1975 Forwards Supplemental Fuel Surveillance Program for Mark C 17 X 17 Fuel Assemblies.Nrc Must Receive 10-day Advance Notice Before Surveillance Commences ML20039H1691975-01-24024 January 1975 Forwards Supplemental Fuel Surveillance Program for Mark C 17 X 17 Fuel Assemblies.Visual Insp of All Peripheral Rods in Initial Core Fuel Assemblies in Spent Fuel Pool Required ML20198E9921974-12-0303 December 1974 Advises That Each Technical Review Branch Responsible for Review of Tech Specs in Psar.Schedule for Requesting Addl Info & Stating Staff Positions on Tech Specs Same as for Other Aspects of Review 1982-04-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20054A6391982-04-0101 April 1982 Notification of 820407 Meeting W/Util in Bethesda,Md to Discuss Cp/Ml Rule Items & Unresolved Safety Issues ML20042C5361982-03-30030 March 1982 Corrects Error in RB Eastvedt 820318 Testimony ML20042A4081982-03-18018 March 1982 Forwards RB Eastvedt,Ea Stull & DC Scalletti Testimony. Notice of Appearance in Proceeding Encl ML20011A7151981-10-28028 October 1981 Forwards 810428 Stipulation Re NRC Position Opposing Consideration of Class 9 Accidents ML20010F7021981-09-0909 September 1981 Forwards Rl Gotchy & R Weller Affidavits Attesting to Authorized Testimony in NRC 781215 Response to Memorandum Concerning ASLB Questions.Nrc Will Move ASLB to Enter Affidavits & Testimony Into Record ML20009G9621981-07-29029 July 1981 Forwards NRC Answers to 810708 Forelaws on ASLB Interrogatories ML19347E6571981-05-12012 May 1981 Informs That NRC Does Not Object to Lk Marbet 810504 Request for Extension of Time to Submit Argument on Proposed Contention AS-5.Extension Would Not Impact on Hearing Schedule Re Alternative Sites ML19345G4791981-04-0202 April 1981 Notification of 810408 Meeting W/Utils in Bethesda,Md to Discuss NRC Activities & Plans for Review of near-term CP Plants Considering Proposed Rule on Licensing Requirements for Pending CP & Mfg License Applications ML20003D5511981-03-26026 March 1981 Advises of Stipulation Re Intervenor Proposed Contentions on NRC Alternative Site Analysis & Discovery & Hearing Schedule.Stipulation Should Be Forwarded within Next Several Wks ML20003C3751981-02-0909 February 1981 Forwards Projected Target Dates for Pending CP Applications. Schedule for CP Issuance Is Heavily Dependent on Scope of TMI-related Requirements ML20083L3481980-12-31031 December 1980 Forwards Action Plan for Resolution of non-TMI Issues for Pending Cp/Mfg License Applications,Per Ofc of Nuclear Reactor Regulation Approach to Resumption of Licensing. Safety Evaluation Inputs Should Be Provided by 810601 ML19256E4001979-09-20020 September 1979 Advises of Marbet Preference for Preliminary Telephone Conference ML19256E4081979-09-12012 September 1979 Forwards Vol 1 of Proposed Findings of Fact,Opinion, Conclusions & Order Re Whether Matl Received as Evidence Meets Energy Facility Siting Council Requirements.Exceptions Should Be Filed by 791005.Summary of Order Encl ML20204B9841978-10-27027 October 1978 Defers Filing Date for Testimony Re Liquid Radwaste Sys to 781103.Argonne National Lab Review Is Delayed.Will Inform Bd & Parties When New Filing Date Is Confirmed ML20037A1631978-10-11011 October 1978 Reviews Sser Input.Proposal Acceptable at CP Stage ML20147C1061978-09-29029 September 1978 Informs Bd of NRC Agenda for Filing Testimony on Open Items in the Matter of Pgecs Subj Facils ML20148A4591978-09-18018 September 1978 Submits Tentative Schedule on Economic Issues to Be Discussed at Facility Proceeding ML20148A4641978-09-14014 September 1978 Repts on Remaining Issues to Be Covered in Proceeding. Hearings on Economic Issues Will Begin on or About 780918. Site Certification Application Will Be Considered in May 1979 W/Decision Expected by Jul 1979 ML20040A6141978-05-15015 May 1978 Forwards Reactor Sys Branch Response to ASLB Question 6 Re Decay Heat Removal Sys ML20040A6041978-04-23023 April 1978 Forwards Reactors Sys Branch Supplemental SER Input for Resolution Items 6,10 & 11 on Passive Failure During long- Term Cooling,Feedwater Isolation & Chapter 15 long-term Operator Actions,Respectively ML20040A7081977-10-21021 October 1977 Forwards List of Open Issues on Facilities & B-SAR-205, Requiring Resolution Prior to CP Issuance.List of Items to Be Addressed at Final Design Stage Also Encl ML20210S7551977-02-0808 February 1977 Discusses Seismology Review Plan for Pacific Northwest Plants Under CP Review.Recommended Actions Summarized.Usgs Will Review Rept of 1872 Earthquake ML20214G6701977-02-0808 February 1977 Forwards Recommended Seismic Review Actions Needed to Resolve Licensing Decisions on Nuclear Plants in Pacific Northwest Under Review for Cps,Per Meeting on 770202 ML19329B6151975-08-27027 August 1975 Discusses Sept Blue Book.Explains Significant Delays ML20039G5081975-08-0707 August 1975 Forwards SER Input for Fuels Section,Nuclear Design Section & Accident Analysis Chapter ML20039H1231975-01-24024 January 1975 Forwards Supplemental Fuel Surveillance Program for Mark C 17 X 17 Fuel Assemblies.Nrc Must Receive 10-day Advance Notice Before Surveillance Commences ML20039H1691975-01-24024 January 1975 Forwards Supplemental Fuel Surveillance Program for Mark C 17 X 17 Fuel Assemblies.Visual Insp of All Peripheral Rods in Initial Core Fuel Assemblies in Spent Fuel Pool Required ML20198E9921974-12-0303 December 1974 Advises That Each Technical Review Branch Responsible for Review of Tech Specs in Psar.Schedule for Requesting Addl Info & Stating Staff Positions on Tech Specs Same as for Other Aspects of Review 1982-04-01
[Table view] Category:NRC TO ASLP
MONTHYEARML20042C5361982-03-30030 March 1982 Corrects Error in RB Eastvedt 820318 Testimony ML20042A4081982-03-18018 March 1982 Forwards RB Eastvedt,Ea Stull & DC Scalletti Testimony. Notice of Appearance in Proceeding Encl ML20011A7151981-10-28028 October 1981 Forwards 810428 Stipulation Re NRC Position Opposing Consideration of Class 9 Accidents ML20010F7021981-09-0909 September 1981 Forwards Rl Gotchy & R Weller Affidavits Attesting to Authorized Testimony in NRC 781215 Response to Memorandum Concerning ASLB Questions.Nrc Will Move ASLB to Enter Affidavits & Testimony Into Record ML20009G9621981-07-29029 July 1981 Forwards NRC Answers to 810708 Forelaws on ASLB Interrogatories ML19347E6571981-05-12012 May 1981 Informs That NRC Does Not Object to Lk Marbet 810504 Request for Extension of Time to Submit Argument on Proposed Contention AS-5.Extension Would Not Impact on Hearing Schedule Re Alternative Sites ML20003D5511981-03-26026 March 1981 Advises of Stipulation Re Intervenor Proposed Contentions on NRC Alternative Site Analysis & Discovery & Hearing Schedule.Stipulation Should Be Forwarded within Next Several Wks ML20204B9841978-10-27027 October 1978 Defers Filing Date for Testimony Re Liquid Radwaste Sys to 781103.Argonne National Lab Review Is Delayed.Will Inform Bd & Parties When New Filing Date Is Confirmed ML20147C1061978-09-29029 September 1978 Informs Bd of NRC Agenda for Filing Testimony on Open Items in the Matter of Pgecs Subj Facils 1982-03-30
[Table view] |
Text
,
,a
?
y u
v s
O W
\\ g\\
i s
\\
\\
September 9,1981 y
s
\\
[ bbY _)
~
2 a.
2 J Ei' 101981 **
\\-
u... uwennon 3
3, cO-n oi G.
y N/
Elizabeth S. Bowers, Esq., Chuiraan Dr. Willian E. Martin m
W Adninistrative Judge Administrative Judge and Atonic Rfety and Licensing Board Senior Ecologist U.S. Nuclear Regulatory Connission Battelle Meuorial Institute Washington, D.C.
40555 Columbus, Ohio 43201 DISTRIBUTION Shapar/Engelhardt Dr. Walter H. Jordan Christenbury/Scinto/Olmstead Aduinistrative Judge FF (2) 801 West Guter Drive Reis Oak Ridge Tennessee 37d30 Bordenick Black E. Adensam In the Itatter of P.Lecch Portland General Electric Company, et al.
NRC Central: LPDR/PDR (Pebble Springs Nuclear Plante Units 1 and 2)
Docket Hos. 50-514 ana 50-515
Dear Administrative Judges:
The Board's " Order Adjusting the Schedule and Relative to the Appendix I Issue" dated August 10, 1981 stated in part, as regards the Board generated
" Appendix I Issue," tnat
[t]here has been an open issue since the last pre-hearing conference in December 1979. Tr. 31 (correctly Tr. Sou4). The Staff asked if the Board was satisfied with the proposed [ additional] Staff testinony concerning Appendix I.
The testinony was filed on fiarch 7, 1979, but the Board had not re-ceived it at the time of the prehearing conference.
It was served again by the Staff on December 26, 1979.
The board has reviewed tne testinony, is satisfied and has no further questions.
It is not necessary for the Staff to present witnesses at the hearing on tnis issue but the testinony should be in affi-davit forn."
Pursuant to the above noted Board directive, enclosed are the recently exe-cuted "Affidevit of Dr. Richard Weller" and " Affidavit of Dr. Reginald L.
d 60tchy." Also enclosed, for the ready reference of the Board and parties, is hI l" a copy of the HRC Staff testinony (dated March,1979) referenced by Drs. Weller and Gotchy in their respective affidavits.
The URC Staff will nove the Board i
to incorporate the enclosed two affidavits, and Staff testimony dated March, OJ
"'c4 conswt) 8109110208 810909 PDR ADOCK 05000514
.G.,
. i.....
.P DR,
" "" - 2m NRC FORM 318 stO 80l NRCM O240 O_FFl_CI A L R ECO R D CO PY
v m
hG p
p.
~. 1979, into the record as if read at the evidentiary hearing session presently scheduled to commence on December 1, 1981.
Sincerely.
Bernard H. bordenick Counsel for fiRC Staff
Enclosures:
As Stated cc:
(w/ enclosures)
Alan S. Rosenthal, Esq.
Ur. Lawrence R. Quarles Richard S. Salzman, Esq.
James W. Durhan Esq.
Warren llastings Esq.
Frank W. Ostrander, Jr., Esq.
lir. Donald W. Godard tir. Lloyd K. Ibrbet Ms. Bernice Ireland Atonic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board J. Carl Freedaan Frank Josselson, Esq.
Willian L. Hallpark, Esq.
R. Elaine lialls. ark Esq.
Kathleen 11. Shea, Esq.
Docketing and Service Section i
e i
I 1
g
"'" > !... 0 ELD,,,W
. summy....BMBo rde n i.
dkw DATEk...gf..y l8..
t ""c roa" 3'n aio,soi nncu o24o OFFICIAL RECORD COPY
' " ao-328 8"
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION i
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
PORTLAllD GENERAL ELECTRIC Docket Nos. 50-514 COMPA!4Y, ET AL.
)
50-515 (Pebble Springs Nuclear Plant, Units 1 and 2)
)
AFFIDAVIT OF DR. REGINALD L. GOTCHY Na;; comes Reginald L. Gotchy, and being duly sworn, deposes and says as follows:
f 1.
I am employed by the Nuclear Regulatory Commission as a Senior Radiobiologist in the Radiological Assessment Branch, Office of Nuclear l
Reactor Regulation.
l l
2.
I am duly authorized to testify as set forth in pages 5-8 of the attached "NRC Staff Response to ' Memorandum Concerning Board Questions' l
l Dated December 15, 1978 Prepared By Dr. Reginald C. Gotchy and Dr. Richard Weller."
I l
l p.o.s. 9 8/y g
. 3.
I hereby certify that the testimony given by me in the above referenced document is true and correct to the best of ny knowledge and belief.
J0
/}
Reg 4ryfld L. Gotchy, PhD Subscribed and sworn to before me this 8 4 day of September,1981.
A1/
Nofary Public f My Commission expire d / / 982 V
9 f
P i
1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of PORTLAND GENERAL ELECTRIC
)
Docket Nos. 50-514 COMPANY, ET AL.
50-515 (Pebble Springs Nuclear Plant,
)
Units 1 and 2)
)
AFFIDAVIT OF DR. RICHARD WELLER Now comes Richard Weller, and being duly sworn, deposes and says as follows:
1.
I am employed by the Nuclear Regulatory Comission as a Section Leader in the Safety Review Section of the Three Mile Island Program Office, Office of Nuclear Reactor Regulation.
2.
I am duly authorized to testify as set forth in pages 2-4 ?.nd 8 and corrected Table 2 of the attached "NRC Staff Response to ' Memorandum Concerning Board Questions' Dated December 15, 1978 Prepared by Dr. Reginald L. Gotchy and Dr. Richard Weller."
- 1A p.4
. 3.
I hereby certify that the testimony given by me in the above referenced document is true and correct to the best of ny knowledge and
- belief, h
Richard Weller, PhD Subscribed and sworn to before me this ?_.ad day of September, 1981.
d'A% Sb Notary Public y
i
/ My Commission expires: M 1,19 '51 -
(/
C l
i i
I i
I i
t March 1979 UNITED STATES OF A.' ERICA NUCLEAR REGULATORY COPf1ISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
PORTLAND GENERAL ELECTRIU Docket Nos. 50-514 COMPANY, ET AL.
50-515 (Pebble Springs Nuclear Plant, Unit Nos. ' and 2)
)
NRC STAFF RESPONSE TO " MEMORANDUM CONCERNING BOARD QUESTIONS" DATED DECEMBER 15, 1978 PREPARED BY DR REGINALD L. GOTCHY AND DR. RICHARD WELLER Introduction In a " Memorandum Concerning Board Questions" dated December 15, 1978, the Board stated that it has received the " Revisions to NRC' Staff Evaluation of Liquid Radwaste System" dated November 3, 1978. The Board noted that "the Staff assumed that 50% of the regenerant solutions will be discharged to the coolant reservoir without treatment." Under that assumption the Staff has estimated a release of 3.8 Ci/yr, over 100 times greater than estimated by the Applicant. However, the Staff's estimate of uhole-body dose to a nearby resident is only 0.033 mrem /yr, much less than estimated by the Applicant. Accordingly, the Board asked for further information from the Staff concerning the basis for the estimated reic:se rates and the calculation of dose.
P C OY 1)tA 600IIIO 318
. Response by Dr. Richard Weller The purpose of this response is to provide the Board with further infor-mation concerning the basis for the estimated release rates of secondary system liquid effluents to the Pebble Springs reservoir.
In addition, this response also includes and is attached as a corrected dose table, Table 2, of supplemental testimony, " Revisions to NRC Staff Evaluation of Liquid Radwaste Systems with Respect to Appendix I of 10 CFR Part 50 and Effect on Overall Cost-Benefit Balance," dated Nover. tar 3,1978, to account for input errors in the previous code calculation of the doses.
As shown in revised Table 2, the estimated doses associated with the nomal operation of the Pebble Springs Nuclear Plant, Unit Nos.1 and 2, meet the requirements of Sections II.A and II.D of Appendix I to 10 CFR Part 50. The discussion of the dose calculations is addressed below in a separate response by Dr. R.L. Gotchy.
The Staff's re-evaluation (November 3,1978 testimony) of the discharges of radioactive material in liquid effluents i:; based on the Applicant's submittal of Amendment 12 (June 1978) to the PSAP..
In Amendment 12, the applicant modified the manner in which the processing of wastes in the Dirty Radwaste System (DRS) is controlled. The modification con-sists of deleting the commitment to fix the setpoint of the DRS process radiation monitor at 10-6 uCi/cc to allow greater flexibility in the operation of the plant. This monitor determines whether the regenerant 1
s solutions will be directed to the DRS for processing or to the supple-menta'l waste holdup tank for ultimate discharge to the reservoir.
In view of the deletion of the comitment to the radiation monitor fixed setpoint and the planned greater flexibility in plant operation, the staff assumed that 50% of the regenerant solutions would be discharged to the coolant reservoir without treatment. The previous staff Appendix I testimony (July 29,1976) assumed that all of the regenerant solutions vrould be processed in the Dirty Radwaste System.
It should be noted that the Applicant's model assumes that all secondary system wastes are dis-charged to the reservoir without processing.
The staff assumption of 50% discharge of regenerant solutions is based on several considerations.
Firstly, the applicant has committed to satisfy the design objectives of Appendix I to 10 CFR Part 50, but has not committed to recycle wastes to the maximum extent practicable.
Thus, the staff has assumed a higher discharge fraction for the Pebble Springs liquid effluents than would be assumed for a plant with a maxi-mucm re.ycle comitment. Secondly, the staff assu'nption of 50% discharge of regenerant solutions permits the applicant to satisfy the design objectives of Appendix I while operating the plant with the desired flexibility. Since it is less costly to discharge regenerant solutions than to process them through the DRS, there is an economic incentive to discharge wastes to the maximum extent consistent with the objectives of Appendix 1.
The assumed discharge of 50% of the regenerant solutions N
1 results in a calculated liquid source term of 3.8 Ci/yr/ reactor (the design objective in the Annex to Appendix I is 5 Ci/yr/ reactor).
It should be noted that this source term is based on " expected" values, over the assumed 30 year life of the plant, of 1.12% failed fuel and primary to secondary system leakage of 100 lb/ day.
It should also be recognized that during the actual operation of the plant, the parameters for fraction of regenerant waste discharged, failed fuel, and primary to secondary leakage may vary significantly from the values cited above.
I For example, for those periods of operation when there is no primary to secondary leakage, all (100%) of the regenerant solutions could be discharged to the coolant reservoir with no resultant environmental impact. However, when the " expected" values for the above parameters prevail, the staff's evaluation indicates that total discharge of 100% of regenerant solutions without treatment would not be within the design objectives of Appendix I.
Conclusion For these reasons, the staff believes that its revised effluent release model is a realistic representation of the planned operation of the i
Pebble Springs nuclear plant.
i
..-...,-,,,,n...,,,..,,-..,,n.,,,,,.,.,..,-..
-,-r,,,..,,.
,_,.,,,--.a,
,-.,,,,,_,w..
-.__e.n,.
. I Response by Dr. Reginald L. Gotchy The Staff has reexamined its liquid pathway dose commitment estimates for Pebble Springs 1 and 2 as a result of releases through the " dirty radwaste system" (DRS) into the cooling reservoir. We have also examined the applicant's dose commitment estimates presented in their Amendment 12 (July 1978), Table II.2-12.
As a result of this review, the staff found the following:
(1) The tritium source term used by the Staff in its November 3,1978 dose commitment estimates was a factor of 10 low due to a card punch error. This was a significant error, since tritium accounts for most of the total body dose commitment. This error has been corrected.
i (2) The turnover rate for the reservoir which the staff had used was high by a factor of about 70. As a result, the reconcentration factor previously used was too low, and thus the corresponding dose commitments were too low. We have not been able to determine the source of this error, since the hydrologist who made the estimate is no longer with the NRC. Nevertheless, it has also been corrected, and the revised Table 2 of the November 3,1978 staff testimony (as noted in Dr. Weller's response above) is attached.
. (
(3) The major dose contributor to total body dose is tritium (about 80%) with the balance due almost entirely to cesium nuclides. Lyen though the applicant's source term for cesium is much larger than the staff's, there is less than a factor of 2 difference in the trititum source tems. Therefore, in terms of contributors to the total body dose commitment, there is not a large difference between the applicant and the staff's source terms.
(4)
In reexamining the Pebble Springs ER and PSAR, the staff concluded that its previous interpretation of potential exposure pathways is correct, but that the applicant has generally been overly conservative in their July 1978 Amendment 12. For example, unless PGE has modified their position, there will be no recreational activities permitted within the exclusion area, and land use (e.g., by Krebs Brothers, Inc.) will be limited to agricultural purposes (ER, p. 2.1-3, 2.1-9;PSAR,p.2.1-3).
Further, under terms of their agreement with PGE, Krebs is prohibited from grazing dairy animals on irrigated crops (ER, p.2.2-7; PSAR, p. 2.1-3).
However, Krebs is pemitted to water livestock at the southerly edge of the reservoir (ER, p.2.5-4; PSAR, p.2.1-3),
and the staff was unable to find an exclusion for watering dairy cattle or using irrigation water from the reservoir for growing food crops for human consumption.
n
I As a result, the staff has calculated total body doses (as well as thyroid doses) for the following potential pathways:
(a) Reservoir water - beef and milk cows (watering)__. man (b) Reservoir water food crops - man (c) Reservoir water.__ grazing crops beef man The following pathways assumed by the applicant in Amendment 12 are in the staff's view overly conservative:
(a) Reservoir water man (drinking water)
(b) Waterfowl -nnsumption (c) Sunbathing (d) Swimming and boating i
(e) Ground contamination (requires living on irrigated grazing land).
When these pathways are removed, the applicant's estimated total body dose would be 0.066 mrem /yr which compares very well to the staff's revised estimate of 0.10 mrem /yr without the milk pathway or 0.21 mrem /yr with the milk pathway for an infant. Thus, the corrected staff estimate would be in reasonable agreement with the applicant for those pathways which could potentially exist.
s
f
. {
Conclusion In conclusion, the staff found and corrected some modeling errors and a punch card error in the tritium source term. The staff finds many of the applicant's assumed pathways are overly conservative and are excluded by written agreements with the land owner (Krebs Boos, Inc.) as stated in their ER. When the staff corrected previous errors and excluded those pathways assumed by the applice.it in their July 1978 Amendment 12 (Table II.2-12), the dose comitment estimates of the staff and applicant are in reasonable agreement.
Finally, it is concluded that the previous conclusions regarding the Appendix I analysis for liquid pathways at the Pebble Springs site remain the same, i.e., the liquid pathways for the proposed two unit station would not result in dose comitments in
(
excess of Appendix I design objectives.
R
TABL" ' (Revised January, 1979)
I COMPARISDN OF PEBBLt JRINGS NUCLEAR PLANT, UNIT NOS. a1 AND 2 WITH APPENDIX I TO 10 CFR 50, SECTION II.A (MAY 5, 197g) AND SECTION 11.0, ANNEX (SEPTEMBER 4, 1975) b Appendix la Annex Calculated c
l Criterion Design Objectives Design Objectives Doses l
l Liquid Effluents Dose to total body from all pathways (Adult) 3 mrem /yr/ unit 5 mrem /yr/ site 0.21 mrem /yr/ unit Dose to any organ from all pathways (infant thyroid) 10 mrem /yr/ unit 5 mrem /yr/ site 1.1 mrem /yr/ unit 1
Doses to Population within 50 mile radius Liqui'd Effluents Dose to total body from all pathways.
Units 1 and 2 1.4 man-rem /yr afederal Register, V. 40, p. 19442, May 5, 1975.
bFederal Register, V. 40, p. 40816, September 4, 1975.
Design Objectives given on a site basis.
Therefore, these design objectives apply to c
2 units at the site.
___