d APPENDIX A NOTICE OF VIOLATION Florida Power and Light Docket No. 50-250 Turkey Point 3 License No. DPR-31 As a result of the inspection conducted on May 26 - June 25,1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980),
the following violations were identified.
A.
Technical Specification 6.8.1. requires that written procedures be implemented. Administrative procedure 11550.1 " Health Physics Procedure HP-1" requires that a Radiation Work Permit or direct Health Physics coverage be provided for work on equipment contaminated in excess of 10,000 dpm/100 cm2, Contrary to the above, neither direct coverage nor a Radiation Work Permit was provided for removal of the Unit 3 liquid release line which was internally contaminated to 20,000 dpm/100 cm2 for about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> on June 3, 1981.
This is a Severity Level V Violation (Supplement I.E.).
B.
10 CFR 50, Appendix B, Criterion V and the accepted QA Program Technical Quality Requirement 5.0 requires that activities affecting quality be prescribed by documented procedures and shall be accomplished in accordance with these procedures. Administrative Procedure 0190.72, Receipt Inspection, Identification and Control of Nuclear Safety-Related and Fire Protection Parts, Materials and Components, requires issuance and attachment of Quality Control (QC) tags to acceptable controlled material until installation in the plant system.
Contrary to the above,(information on QC tags attached to several items' A.P. 0190.72 was not followed in that during the inspection period the includiag 3/4 inch T-78 globe valves and Pacific Scientific Company mechanical sncbbers was incomplete and erroneous. This lack of information disabled the tractability system of the items to purchase order, receipt and procurement doct7 ants.
This is a Severity Level VI Violation (Supplement..F.).
01090955%
1....
,t, c
t.p.
. g.
., - n L
Florida Power and LightICompany 2
Docket Nos. 50-250 and Notice'of Violation 50-251-l Pursuant to the provisions 1of 10~CFR'2.201,~you are.hereby required to submit to l
this office within thirty days of ~the date of this Notice, a written statement or
..explanation in reply,. including: (1) admission or denial of the alleged viola-tions;- (2)-the reasons for the violations.if admitted; (3)'the~ corrective steps
~
which have been taken and the results achieved; (4) corrective ' steps which will
~ be taken to avoid further violations; and'(5) the date.when full compliance will-be' achieved. Considerati n may be given to extending your response time.for good
. cause?shown. Under the-thority of Section 182 of the' Atomic Energy Act of
- 1954, as amended, this re. >onse shall be submitted under oath or affirmation.
l
[
Date:_JJJL 171441 i