ML20010F017

From kanterella
Jump to navigation Jump to search
Forwards LER 81-053/03L-0
Date released: 01/24/2020 Download: ML20010F017


LER 81-053/03L-0:on 810728,diesel Generator 1C Tripped Under Load & Declared Inoperable.Caused by Failed O Ring Between Cylinder Liner 11 & Cylinder,Allowing Water to Enter Cylinder & Overflow to Other Cylinders
ML20010F024
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/02/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010F024 (2)
Forwards LER 81-053/03L-0
ML20010F015
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/02/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010F015 (1)