ML20010E724

From kanterella
Jump to navigation Jump to search
Forwards LER 81-082/03L-0
Date released: 01/24/2020 Download: ML20010E724


LER 81-082/03L-0:on 8710728,HPCI Steam Line Switch 1E41-N005 Failed to Actuate on Simulated High Flow.Caused by Setpoint Drift.Barton Flow Switch Recalibr & Returned to Svc
ML20010E729
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/20/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010E729 (2)
Forwards LER 81-082/03L-0
ML20010E723
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/20/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010E723 (1)