Text
_
,. ~
.y g
g f
l en Mu.
SEp 01 fgg
{
September 2,1981 u,,,
8D%
N4'al [QM;' ~
4
\\,
Sheldon J. Wolfe, Esq., Chairaan Dr. E. Leonard Cheatum Administrative Judge Administrative Judge Atomic Safety and Licensing Route 3, Box 350A t$oard Panel Watkinsville, 3eorgia 30077 U.S. Huclear Regulatory Couaission W1snington, D.C.
2055S DISTRIBUTION Mr. Gustave A. Linenberger Black Administrative Judge M
Atomic Safety an i Licensing An on Board Panel Schinki U.S. liuclear Regulatory Commission De Washington, D.C.
20555 e
Shapar/Engelhardt Christenbury/Scinto In the Matter of FF (2) ilouston Lighting and Power Company NR ens e
Hu ear GeneradngJtadon, Unh O LPDR/ R RA Docket No. 50-460 B.Youngblood C. Moon
Dear Administrative Judges:
Pursuant to the Board's Order of June 16, 1981, as modified during ae hearing session of August 28, 1981, the Staff has conferred with the Appli-cant regarding the order of presentation of witnesses for the September 14-18 dnd UCtober 5-16 hearing sessions. As a result of these discussions, the Staff and Applicant submit the attached Order of Witness Presentation.
Witn the Board's permission, the Applicant intends to file all of its testi-uony with respect to the issues surviving suaaary disposition uotions on Sept.euber 18, 1981. The Staff will file its testimony regarding bishop Contention 1 ana Doherty Contention 38(b) on the same date.
This will pro-vide the required fifteen day lead time prior to October 5.
The Staff will file the testimony to be presented during the week of October 12 on oc before Septecuer 25, 1981.
D I
i
{
"/
0109080014 810902 l
su,
PDR ADOCK 05000466 PDR DATE"lG
. l....
.l.
NRC FORM 318 t10 80t NRCM O.!40 OFFICIAL RECORD COPY
- weo-32 n 24
T[
f I[
4 i
'
- Should the Board have any probleus with the proposed schedule, we would ap-preciate being so advised as soon as possible so that any necessary adjust-nents can be made.
Sincerely, Stephen M. Schinki Counsel for tiRC Staff cc:
The lionorable Ron Waters J. Gregory Copeland, Esq.
Susan Pletttiari, Esq.
David Preister, Esq.
ilon. Jerry Sliva lion. John R. Itikeska lir. John F. Doherty fir. Williau J. Schuessler Jack fiewman, Esq.
Brenda A. McCorkle lir. Wayne Rentfro Leotis Jonnston Ilargaret Bishop J. Itorgan Bishop Stephen A. Doggett, Esq.
Carolina Conn
/itonic Safety and Licensing Atomic Safety and Licensing Board Panel Appeal Board D. liarrack Texas Public Interest Rosemary li. Lemer Research Group, Inc.
Carro Hinderstein U.S. liuclear Regualtory Comission Bryan L. Baker Region IV, 1&E Robin Griffith tir. Willian Perrenod Docketing and Service Section emcr >
OELD M
'$ % Kink 1Nks s o,, m, p 50peig..
^ " >;. 0. 9. /.,d8.1..
'" 'S*-32$ 824 NRC FORM 318110: 80l N RC M O24 0 CFFICIAL RECORD COPY
I l
4 Order of Presentation of Witnesses Sept. 14 AM:.TEXPIRG AC 21 (Outside containment McCracken sampling)
TEXPIRG AC 28 Schemel
{
(Post-accidentmonitoring) l PM: Doherty 29 Mercurio; (Blockage of intake canal)
Pearring Board Question Mercurio;-
(Soil mechanics)
Sept. 15 AM: Baker Contention 1, et-al.
Dean (Financial qualifications)
PM:
Heed for power update Edwards, Guy Sept. 16 AM: Bishop Contention 17
-Iotti; Campe (TNT detonation) 1 PM:
Bishop Contention 6, et al.
Iotti; Campe l
(Pipeline Rupture / LPG) i Sept. 17 AM:
Bishop Contention 6 (Cont.)
Iotti; Campe 4
PM: McCorkle Contention 9 Campe (Chlorine Monitoring)
Doherty Contention 40 Read (Part 100 releases)
Sept. 18 AM:
Doherty Contention 17, et al.
Hucik (SRV reliability)-
M - PM Schuessler Contention 1, et al.
- Murri, (Emergency planning)
Griffin, Lawhn -
i.
Oct. 5 AM - PM:
4
~
Doherty Contention 8, et al.
Hodges (ATWS) i-
, TEXPIRG AC 41 Hodges (Reactor pressure limit /SRV)
TEXPIRG AC 53 Hodges (Noncondensible gases)
TEXPIRG AC 55 Hodges (Rapid depressurization/ steam break)
Board Questions Hodges (RHR single failure; non-safety grade equipment)
Doherty Contention 42 Hodges (Position indication for SRV)
Oct. 6 AM: Continuation of Hodges issues PM:
Doherty Contention 38(o)
Hodges (Cold shutdown in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)
Doherty Contention 41, et al.
Huang; (Reactor water level indicators)
Hodges Oct. 7 PM:
Doherty Contention 26(a)
Moon (Stud bolts)
Board Questions 2 and 7 Moon Oct. 8 AM: TEXPIRG AC ll Oprea; (Technical qualifications)
Goldberg PM:
Allenspach; Gilray Oct. 9 AM:
Bishop Contention 1, et al.
- Soffer, (Population)
Farrell PM:
Open Oct. 12 AM:
Baker Contention 1, et al.
Staff (Financial qualifications)
PM:
Schuessler Contention 1, et al.
Staff (Emergency planning)
Oct. 13 AM:
Doherty Contention 35 App./ Staff (Welder training)
. PM:
Doherty Contention 45 App./ Staff (Core lateral support)
Oct. 14 MI: *TEXPIRG Contention 10 App./ Staff (IGSCC)
PM: *Doherty Contention 44 Applicant (Waterhammer)
- Doherty Contention 43 Applicant (Stainless steel coating)
Oct. 15
(Suppression pool uplift)
Applicant PM: McCorkle Contention 17 Applicant (Bypass leakage).
Doherty Contention 11, et al.
Applicant (Spent fuel pool accident)
Oct. 16
- 1:
Doherty Contention 24 (Rod Drop)-
Applicant and Short Reactor Period Board question Doherty Contention 28 Applicant (Control rod ejection)
PM: McCorkle Contention 14 Applicant (WIGLE Computer Code)
- /
The Applicant intends to present a panel with respect to these three issues.
..-