ML20010E172

From kanterella
Jump to navigation Jump to search
Forwards Operational QA Plan,Revision 9.Revision Reflects Changes in Gpu Nuclear Corp Organization
ML20010E172
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/31/1981
From: Hukill H
METROPOLITAN EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20010E173 List:
References
L1L-241, NUDOCS 8109030169
Download: ML20010E172 (1)


Text

_ -.

i i

Metropolitan Edison Company Post Office Box 480 Il L -

Middletown, Pennsylvania 17057 Writer's Direct Deal Number August 31, 19E '

1 LlL-241 f.) C)'/,

i f

N Office of Nuclear Reactor Regulation

{g 7

Attn: John F. Stolz, Chief

  • )i i

Operating Reactors Branch No. 4 9

j*

U.

S. Nuclear Regulatory Commission p SEP 0 ?.1981

  • 4 I

Washington, D.C.

20555 U.s. wxuxa emutArosil ccwoussion g j; l

Dear Sir:

q I

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

/ ro Operating License No. DPR-50 Docket No. 50--289 Operational Quality Assurance Plan Revision 9 Enclosed please find an uncontrolled copy of the TMI-1 Operational Quality Assurance Plan of March 28, 1981.

Section I was changed to adhere to the GPU Nuclear Corporation Organization with changes in subsequent sections to reflect changes in Section I.

Additionally, l

clarifying com:nents have been added to various portions of Revision i

8.

This 1 vision does not reduce in any way the level of the

{

quality and does not involve an unreviewed safety question.

Sincerely,

?

[

~

{ t H,

D.

itkill Director, TMI-1 Enclosure ec:

B. H. Crier L. Barrett i

W:d God 9'

$1g 8109030169 810831 PDR ADOCK 05000289 PDR p

Metropottan Edison Company is a Member of the General Pubhc Utaties System

_.-_ - _, _._- m, --._-_., _ _._ _. _.-_._,_. _.- _ _-, _ _ _ _... _ ___ _.. _. _. _,_,-.-_,_ _