_ _ _
_
_
!a
k
be
v
s
s
.
,.
. .
I
M)G 12 @
Docket tio. 50-73
-
qlNY
V
NL A (
y ~/
(V
$
%v
<'
V
General Electric Company
U
Vallecitos Nuclear Center
P. O. Box 460
' I' 3U U 88I" T
Pleasanton, California 94566
u.s.
4
Atcention: fir. R. W. Danuitzel, Manager
["
Irradiation Processing Product Section
4
-
Gentlemen:
Subject:
NRC Inspection of NTR Facility
This refers to the inspection conducted by !!essrs. G. B. Zwetzig and
J. W. Hornor of this office on July 21, and 22,1981 of activities
authorized by NRC License No. R-33, and to the discussion of our findings
held by fir. Zwetzig with you and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure
under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office
by telephone within ten (10) days from the date of this letter of your
intention to file a request for withholding; and (b) submit within
25 days frem the date of this letter a written application to this
office to withhold such information.
If your receipt of this letter has
been delayed such that less than seven (7) days are available for your
review, please notify this office promptly so that a new due date may be
established.
Consistent with section 2.790(b)(1), any such application
must be accompanied by an affidavit executed by the owner of the infonnation
which identifies the document or part sought to be withheld, and which
/
8109030134 810812
_
_
g,ll
DR ADOCK 05000
"" N . RV
,,,,,,[.
g(
,
" ""w ) ZWET
mn. ,
.tiORROR.
. . J0WJ.
STE'RNBERG
..
^" )
8/],/81
8@/81l
8////81
8/p/31
....
.
yc muu se no mucu c2"
OFFICIAL RECORD COPY
- "*3=
.
_
i
,
.
,; M
7
Gonecal Electric Con u ny
-2-
contains a full statnaent of the basis on which it is clained that the
information should be withheld fro, public disclosure.
This section
further re'iuires the statement to address with specificity the consiaerations
lis+.eJ in 13 CFR 2.791(b)(4).
The infomation sought to be withheld
shall be incorporated as far as possible into a separata part of the
a f fi davi t.
If we da not hear froa vou in this regard within the specified
perio js notmi above, the report will be placed in the Public Jacunent
Roon.
Shoul1 you have any questicas concernina this inspection, m will be
gl1J ta discuss tne; with you.
Sincerely,
Original signed by
D. M. Sternberg
?. M. Sternberg, Chief
Reactor Operations Projects
3 ranch
Enclosure;
l
IE Ins,m tion Report
"o.
50-73/01-03
Sent to DMS for DCS processing
Distributed by RV:
Engelken (1tr)
LFMB (ltr)
State of CA (Hahn/ Johnson)
l
-