Text
'
4,
{
6 UNION ELECTRIC COMPANY 1908 GRATioT STREU' ST. Louis. Massouns MMUNG ADDR.SS:
JOHN K. S RYAN
... _.. O. aboja 34 0 P
.. 03..
August 19, 1981
. h' 5(h)8'C 9
i
,- Q, f
,/(~f/
Mr. Harold R.
Denton
' e3 4 Director of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission s
Washington, D.C.
20555
Dear Mr. Denton:
ULNRC-481 DOCKET NUMBERS 50-483 AND 50-486 CALLAWAY PLANT, UNITS 1& 2 FINAL SAFETY ANALYSIS REPORT
Reference:
Union Electric Letters to the NRC (ULURC 477 and 478),
dated August 14, 1981, signed by J.
K.
Bryan The referenced letters refer to the submittal of our responses to items generated from the NRC Management Revicw of July 14, 15, 16, 1981, and the submittal of Chapter 18 of the FSAR Site Addendum which contains the Callaway specific responses to NUREG 0737.
Transmitted herewith are additional items of information to be included with the referenced Management Review Responses.
Also enclosed it. a copy of the Management Directive on Shift Supervisor Responsibility and Duties.
This information is hereby incorporated into the Callaway Application and will also be incorporated into a future revision to the FSAR as applicable.
Per request of Jim Peschel, Region III NRC Office, a copy of Chapter 18 of the FSAR Site,iddendum is being sent to
- him,
't er/rulyyours, j%Ndhm%
Pryan
\\
(JohnK.
U DJW/afg
$coi Enclosures y
/ I l
8108210508 810819 DR ADOCK 05000483 PDR
]
1 STATE OF MISSOURI )
John K.
Bryan, of lawful age, being first duly sworn upon oath says that he is Vice President-Nuclear and an officer of Union Electric Company; that he has : cad the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information end belief.
10
[ 14 By 7 Ap\\
/J5 in A.
ryah
@ ice Presidedt l
Nuclear SUBSCRIBED and sworn to before me this 19t'a day of August, 1981 Y5Elddi{
/
'u ! t Y $.
e,,
0 't *j y; j A
l E
cc:
Glenn L.
Koester Vice Precident Operations Kansas Gas & Electric P.O.
Box 208 Wichita, Kansas 67201 John E. Arthur j
Chief Engineer Rochester Gas & Electric Company 89 East Avenue Rochester, New York 14649 A.
V.
Dienhart Vice President Plant Engineering and Construction Northern States Power 414 Nicollet Mall i
Minneapolis, Minnesota 55401 Donald T. McPhee Vice President Kansas City Power and Light Company 1330 Baltimore Avenue Kansas City, Missouri 64141 Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M.
- Street, N.W.
Washington, D.C.
20C36 1
I Nicholas A.
Petrick Executive Director j
SNUPPS y
S Chake Cherry Road l
Rockville, Maryland 20850 W.
Hansen i
Callaway Resident Office U.S.
Nuclear Regulatory Commission RR#1 Steedman, Missouri 65077 Gordon Edison Project Manager - SNUPPS U.S.
Nuclear Regulatory Commission Washington, D.C.
205'5 l
Jim Peschel, NRC - Inspector U.S. Nuclear Regulatory Commission Region-III 7999 Roosevelt Road
[
Glen Ellen, Illinois 60137
-.. ~.
.c,-
a ss*
~
~~
Ausset 19, 198t 00ERN-81-46
'Ds:
D. Walker Additional Questions from NRC en UE Response to the NRC Management Review Items
_ Fer your request of 8/18/81,-the additional commente are prov[ded:
" 1. ' Item 5 - Additional Clarifications of Upton Electric Response to
~
Nukes 0717 (T.C.5)
~
Comment: The activities set forth in response to item L.C.5 will be governed by procedures on which QA will audit or perform autveillances annually.
. 2..
Item 20 - Clarification of Union Electric Fire Protection Program and Description la the FSAE Hodify proposed FSAR 9.5.1.8.1.4 j
9.5.1.8.1.4 Drills Fire brigade drills are conducted on a quarterly basis at Callausy Plant.
Each F* re Brigade camber shall participate in at least two drills per year.
Drills u131 be of two types: announced and unannounced. At.1enat one unannounced drill per year will be held for each TJte brigade. Training objectives are established prior to the drill by the Safety Supervisor. Afterverde. to determine how
'~
~
well 'the ~ taaining objectives have~been met the drill is critiqued on the following points:
Add 9.5.1.8.1.5 Peetings Regular planned cectings shall be held quarterly for fire brigade members to revleu changes in the fire protectian program and other subjects as necessary.
3.
AddtoFbARclarifications ED
.h en e
6 gAus q
y
___y
--,.,.7-._p,
- m e
F q_
Radfation - Chemics 1 Technician 1.
High school education or equivalent.
~
2.
3 years experience in Health Physics oc chemistry of which one year should be related Technical Training.
Radistfon - Chemical Technicians s
-e-Perfstas chemistry, health physica, and environmental monitoring related work at Callaway. He assists in the de2elopment of
. Plant procedures. He reports to the Radiation - Chemical Foremen.
f h
Carry L. Randolph CLR/jne cc: ACP HAS JED Jtg.
FDP E56.50 JRPe TEM APN
~
4 m
- =m em ee e e.
438 g 'g.mp g
{
W SHIFT SUPERVISOR RESPONSIBILITY AND DUTIES CALLAWAY PLANT In accordance with Nuclear Regulatory Commission guidance, this directive is to cmphasize the primary management responsibility of the Shift Superviucr for safe operation of the plant.
Callaway Plant Administrative Procedure AP-A-25 will provide a more detailed explanation of the Shift Supervisor duties, responsibility and authority.
The Shift Supervisor is responsible to maintain a broad perspective of conditions affecting the safety of the plant as a matter of highest priority at all times.
He should not become totally involved in any single operation in times of emergency when multiple operations are required.
He shall utilize his authority to insure that he can maintain an overview of the situation, to make decisions, and to direct operations.
During accident situations, the shift Supervisor should remain in the control room to direct activities.
The Shift Supervisor may be relieved of his duties by the Superintendent of Operations or an Assistant Superinten-dent of Operations, if his deportment warrants such action.
The Operating Supervisor assumes the duties and respon-sibilities of the Shift Supervisor if he is incapacitated.
Administrative duties assigned to the Shift Supervisor shall be limited to avoid loss of the ability to provide direct command oversight of o; srations that are important to safety.
To support this policy, a periodic review of administrative duties shall be conducted by the Plant Superintendent and the Vice President-Nuclear.
This eview shall include direct input from the Shift Supervisors.
It is emphasized that the Shift Supervisor is respon-sible for thc safe operation of the plant and all related activities.
He has the authority to take actions as necessary to maintain the plant in a safe condition.
He is responsible for insuring that plant and corporate management are informed of all conditions that could af fect the safety of the general public, or plant personnel, or the protecti.on of plant equipment.
The line c f author 1ty within the Callaway Plant staff for c.nduct of operations shall ne as follows:
1.
Plant Superintendent 4.
Asst. Superintendent, Operations 2.
Assistant Plant Superintendent 5.
Shift Supervisor (on shift) 3.
Superintendent, operations In the event the Plant Superintendent is unavailable, the above members of the piant staff assume his responsibilities, duties, and authorities in the order of availability
'sted.
C
.