OPERATING DATA REPORT
~
50-344 DOCKET NO.
DATE 8/3/81 COMPLETED BY G. J. Kent l
TELEPHONE 503/ss6-1713 Ext 294 OPERAT!NG STATUS Notes 4
Troian Nuclear Plant
- 1. Unit Name:
None d
hiv 1981
- 2. Reporting Perio :
3411
- 3. U-=1 Thermal Power'(MWt):
1216
- 4. Nameplate Rating (Gross MWe):
1130
- 5. Design Electrical Rating (Net MWe):
1122 i
- 6. Maximum Dependable Capacity (Gross MWe):
1080 I
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (f rens Number 3 Through 7) Since Last Report. Give Reasons:
Ndne I
i N=
' 9. Power LevelTo Which Restricted If Any(Net MWe):
N/A
- 10. Reasons For Restrictions,if Anf:
' This Month Yr.-to-Date Cumulative
- 11. Hours in Reportiag P riod 744 5087 43079
~
470 0 3062.3 25823.6 i
- 12. Number Of Hours Resctor Was Critical n
0 2171.8
- 13. Reactor Reserve Shutdown Hours 340.6 2908.8 24902.3 a
- 14. Hours Generator On.Line 0
0 1508.7
- 15. Unit Reserve Shutdown Ho_a 9275355 77842037 AsoA19
- 16. Gross Therm! 5nergy Generated (MWH) 96966; 1028030 25403416 l
- 17. Gross Electrical f nergy Generated (MWH) mm 90 ognu s
?1061104 1
- 18. Net Electrical Energy Generated (MWH) 45.8 57.2 57.8
- 19. Unit Service Factor as R 57.2 61.3 4
- 30. Unit Availsbility Facor 99.5 52 1 51.5
- 31. Unit Capseity Factorii'ang MDC Net) 28.2 49.7 49.2 1
' 22. Unit Capacity Fsetor (U3ing DER Net) 40.2 7.3 0.9
- 23. Unit Forced Ourage Rate
- 24. Shutdowns Scheduled O~er Next 6 Months (Type. Date.and Durstion of Esch1:
j
~
None i
N/A
- 35. If Shut Down At End Of Report Period. Estimated Date of Startup.
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved J
INITIAL CRITICALITY
,,N/A N/A N/A N/A INITIA L ELECTRICITY N/A N/A
'OMMERCIAL OPERATION i
4 l
0108210368 810806
.('lI7) 4 DR ADOCK 05000
,3
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-344 i
UNIT Troian UAYL 6.l.3.l.EL COMPLETTD BY C -
3-Var TELEPHONE 50_3/556-3713 1
294*
Ext.
i MONTH July'1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) g
-7 g7 220 j
2
-12 13 66
-31
-9 3
g, 4
-34 20 423 i
j
-34 23 737 6
-34 22 1053 l
7 23
-33 1061 t
-4 24 1060 9
134 25 732 10 71 26 714 11
-19 27 763 1
j 12
-19 23 816 j
)
13
-17 9
837 14
-15 30 650
-21 15 3n 842
~30 16-INSTRUCTIONS 1
On this farmst, list the aversge daily unit power level in MWe. Net for each day ir. the icp >rting month. Compute to the nearest whule megswatt.
1 (9/77) t r
t W u --- ~. -
S
~-
DOCKET NO. 50-344
~
UNITSilUTDOWNS AND POWER REDUCTIONS UNIT NAME Tro9n DATE 8/3/81 COMPLETED BY c -
T-rone REPORT MONTil July 1981 TELEPilONE 503/556-3713 Ext. 294 "t.
}.!f k Licensee Eg hl,
.$ E 3
Cause & Corrective No.
Date o;
Eg s
g&
Event u
o-3 Action to
@ v?
fu
[E 5
j g8 g
. Report #
. Prevent Recurrence 5
81-04 810501 S
173.5 C
1 NA NA NA' NA 81-05 810708 F
12.6 B
3 NA IIA NECFUN Load limit potentiameter was run up in preparrtion for main turbine overspeed test after initial warm up period.
Control valve positipn increasedere-sulting in clearing P-7 and turbine tripped on ovgrapeed passing Reactor trip.
81-06 810709 F
9.8 B
4, NA IIA
- Filtu, liigh temperature on main turbina thrust Flode 2 bearing and #2 main bearing. Two st,f rt Flaintal ne!!
up strainers were.'found in the bearing supply line and one itt the #2 bearing oil supply line which were removed as required.
\\
b 81-07 810710 F
167.4' A
3 NA CB PUMPXX liigh temperatuce on lower radia? bear-
'ng of 'B' RCP with concurrent oil i
l j
reservoir alarm. Operators quickly
[
[
- reduced reactor power to <10% and tripp ed the pump. Reactor tripped on loi.p essurizet.
I 2
3 pressure f dom transient which followed.
F: Forced Reason:
Method:
Exhibit G-Instructions Lower bearing S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data replaced.
B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling J Automatic Sc:am.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other(Explain) 0161) 1 E-Opuator Training & License Examination F-Administrative 5
G-Operantonal Error (Explain)
Exhibit I-Same Sourec (9/77)
Il-Other (Explalu) l
+
i 1
.t
UNITSilUTDOWNS AND POWER REDUCTIONS DOLKET NO. so-164 UNIT NAME Trolan o
DATE A/1/R1 COMPLETED BY c
.1. Kent REPORT MONill July 1981 TELEPilCNE 301/556-3711 Ext. 294
.! E 3
.)Yf Licensee fi Cause & Correceive
'h Eg 5
2 s a:
Event N".
Dale v.*y j]
o.
Action to y
$E cM j di g Report #
- Prevent Recurrence 6
81-08 810717 F
3.1 G
2 NA CII
~PUttPXX While valving in a second main feed pump for higher power operation, the operating, main feed pump tripped on low suction pressure sensed in the 4
suction cross-connect line.
81-09 810718 F
30.7 D
4 NA III DD11NX liigh steam generator. cation conddctivlt y Ffode 2 forced power reduction and manual trip Flaintai ned of main turbine.
81-10 810719 F
1.1 Q
4 NA 4B ZZZZZZ 111 -111 Idvel in 'D' S/G trippe'd 'N' Ffode.2
/
MFP and maih turbine off line.
t!aintai ned 81-11 810725 S
0 F
NA NA NA NA Power reduced frodt to 70% per load dispatcher.
81-12 81-0730 F
4.1 C
3
.NA IIB VALVoli Utility worker inadvertently: hit' MSIV solenoid for
'B' MSIV causJng it to trip shut.
Reactor trip from 'B' S/G Lo-Lo level.
I 2
3 4-F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipinent Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling J.Automalle Sc.am.
Event Report (LERI File (NUREG.
4 Other(Euplain) 0161)
D Regulatory Restrictiori E Operator Training & License Examinailoti F.Administrelive (9/77) ll Other (Explain)
Exhibit I.Same Source i
G-Operational Error (Explain) e-r p -
g t
Dockstt No:
50-344 Date:
Trojan Completed by: - G. J. Kent Telephone:
503/556-3713 Ext. 294~
1 i
SUMMARY
OF OPERATING EXPERIENCE t
i l-OPERATION:
l The month began with the plant in cold shutdown. Heat up commenced July 2, 1981.
-The plant entered Mode 3 on July 3, 1981. As temperature and pressure approached NOT & NOP evidence of a failed inner Reactor Vessel seal caused. personnel to shift to the outer 0-Ring seal. An unusual event (RERP) was declared July 3, 1981, when l
RCS leakage exceeled STS limits due to A, B, and C RCS loop drains which had to be
-torqued shut. Reload Physics Testing started July 4, 1981, with the plant enter-i ing Mode 2 the same day. On July 10, 1981, the Reactor was manually tripped when 1
'B' RCP lost oil to its lower bearing. The plant was' cooled down to 360*F while repairs were made to the pump. The Reactor was taken critical again on July 17, l
1s81, but was shutdown to Mode 2 on July 18, 1981, due to high cation conductivity in the steam generator.
The plant returned to power July 19, 1981, and went on to complete Reload Physics Testing July 22, 1981. On July 30, 1981, the Reactor' tripped on 'B' steam generator lo-lo level when a utility worker inadvertently caused 'B' MSIV to shut while c1 caning on the main steam support structure. The plant was recovered and closed out the month on-line producing power.
MAJOR SAFETY RELATED MAINTENANCE:
1:
l Work continued on improvement modifications to the Plant Security and Fire Pro-l tection Systems.
Vork continued on modifications of walls to improve seismic integrity.
I Work continued on several TMI-related design modifications.'B' RCP lower radial i
bearing replaced after loss of oil in lower reservoir.
~
Work completed on 'C' turbine generator preventative maintenanca and repair.
I.ICENSE' CHANGES:
~~.
None f
MLSCELLANEOUS:
. Work continued on Techt.ical Support Center.
Electric Aux. Feed pump overheated, repairs in progress.