Responds to NRC 810622 Ltr Re Violations Noted in IE Insp Rept 50-293/81-06.Corrective Actions:Radiological Environ Monitoring Program Sample Status Log Instituted
ML20010D003
Person / Time
Site: Pilgrim
Issue date: 07/23/1981
From: Morisi A
BOSTON EDISON CO.
To: Snyder G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20010C999 List:
References
81-173, NUDOCS 8108210367
Download: ML20010D003 (2)


Text

_. _ - _ _ _ _ _ _ _

~

t .eE w , e BOSTON EDIEJN COMPANY DENERAL OrracEs 800 movta;ON STnEET BoaTON. MASFACHUEETTS O2199 I A. v. si uA 1 .R f dCLEAR OPERATIONS SUPPORT DEPARTMENT July 23,1981 BECo. Ltr. #81-173 Mr. Gary L. Snyder, Chief Emergency Preparedness and Operational Support Branch .

Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission l 631 Park Avenue Xing of Prussia, PA. 19406 License No. DPR-35 i

Docket No. 50-293

(

I Response to IE Inspection 81-06

Dear Sir:

The following is Boston Edison's response to the item identified in IE Inspection 81-06, NRC Letter of June 22, 1981
.

I

Notice of Violation "A"

' Technical Specification 6.9.C.2.b, " Anomalous measurement report", states, in l part, "If radioactivity in an indicator medium from an offsite location is found and confimed at a level exceeding ten times the control station value, a writ. ten report shall be submitted"..."within 10 days after confirmation."

Confirmatory analyses are to be completed within 30 days of the receipt of the anomalous measurement.

Contrary to the above, as of the dates of inspection, no written report was submitted to the NRC concerning milk sampled on January 28, 1980 at Plimouth Plantation, in which the Sr-90 level was in excess of ten times that of the control station (Whitman farm), sampled on January 24, 1980.

Response

To ensure that this type of error is not repeated, a ;1adiological Environ-mentel Monitoring Program (REMP) Sample Status Log has been instituted.

The REMP Sample Status Log indicates the following: *

a. the type of sample media b '. the sample station l

, h8210367sjogj4-G ADOCK 05000293-

! PD81.

L

" 4 w ,o *-

~

CO3 TON E* ::DN COMPANY

.Mr. Gary L. Snyder, Chief July 23,1981 Page 2

c. the date the sample was collected
d. the date the Yankee Atomic Environmental Laboratory (YAEL) received the sample _.
e. the date the analysis report was received from YAEL.

This type of sample tracking mechanism allows for a rapid detennination of the status of a particular sample.

The manner in which the REMP Sample Status Log is to be maintained will be i incorporated into the HEMP Procedures.

The required LER will be forwarded by July 24, 1981.

Full compliance will be achieved by August 1,1981.

We believt. this response to be satisfactory. If, after reviewing it, you snould ,

have any further questions, please contact us. J Very truly yours, Comonwealth of Massachusetts)

County of Suffolk ) l Then personally appeared before me A. Victor Morisi, who, being duly sworn, did state that he is Manager - Nuclear Operations Support of Boston Edison Company, the applicant herein, and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.

My.Commis 'on expires: .s, / 7, f f f 6 %thum lf b [

Notary Pubiic f p

4

. , , . . _ . +- ---

, , - , , _ , , , ~ . _, ._ ,_.,, _,, ., _. ,e-