ML20010C997

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for June 1981
ML20010C997
Person / Time
Site: Salem 
Issue date: 07/10/1981
From: Miller L
Public Service Enterprise Group
To:
References
NUDOCS 8108210363
Download: ML20010C997 (1)


Text

bleheb tJhM came CORRECTED COPY CPEA* G CEA IE POIC DcxDcEr to..

50-311 pmg :

July 10,.981 C:w:z:rD sy:

L.K. Miller 609-365-7000 X507__

m,.g,

l%

e,/y

\\

EU <D ! s Q g [g 1.

thit Name Salem #2 Noe :

f q

j-2.

W Periai June 1981 3.

ri-=ad "har::al Power Dett):

3411 E'

4.

Nanuplate Racing (Gross fede):

1162 1-e to es V[

111b 5.

Design Electrical Rat ng 03et !44s):

4 /'

6.

fe=v'== Degeahla capacity 1 Gross 24de): 1149

/

( g6 7.

fe=vam= Depenriahia ramp ty (Nec tede) :

1104 8 _

l 8.

If Changes occ:r in capacity Ratings (Item tAzter 3 trough 7) Since Last Bescrt, Give Raam21:

N/A 9.

Power Invel 2 letich Rest::1.=ad, If Any (Net 29de):

NONE 2D. Baascms For hima, If Amy N/A "his !enth Year tc Date Camalative 720 4.343 10,512 H.

M In Repor'h.g Per' d'

22. taxene of azurs React =r was Critical 256.5 457.9 726.1
13. Anacter anserve Shutdown a:iurs 0

0 0

14.

Sours Ger.srator On-Line 78.6 78.6 78.6

15. Unit nae Shatzbwn arts 0

0 0

78,098 78,098 78,098

16. Gross e m at Energy Gerarated09fE)
17. Gross Electrical Iber;y Generatadose) 12.090 12.000 12.090
18. Net Electrical !W Canarated0tE) 0 0

0

19. Unit Servics Factor 0

0 0

20. Unit Av=41=h414ty Factor 0

0 0

21. Q11t l'apar-ity Factor (Using ICC Net) 0 0

0

22. Unit Capacity Facter (Using DER '.et) 0 0

0

23. cnit ro:oes Octage Rate 0

0 0

24. Shutdoms 3ct**n ad Over Next 6 firitts (?fpe, Date, and L', atirn cf Each):

l

25. If Shut roa At End of Reoort Period, Esti:nated Date of startup:
26. Chits In hst Status (Prior to Ca:cercial Operation):

Forecast Act:ieved INICAL CRn'ICM.Irr 6/30/80 8/02/80

.5 Ixi n AI, ze.u m u 9/01/80 6/03/81 op e l-7.R2 9724/81 NA pg, CamERC:H. OPERA =m G108210' 43 810710 PDR ADOCK 05000311 f/-

R p;gg)