l Modification f;o. 5
- /
Supplemental Agreement to Contract No. NRC-04-76-299 i
SUPPLEMENTAL AGREEMENT BETWEEN l
VANDERBILT UNIVERSITY l
AND THE U. S. NUCLEAR REGULATORY COMMISSION i
l THIS SUPPLEMENTAL AGREEMEffT, effective the 1st day of July
, 19 81, by i
and between the UNITED STATES OF AMERICA (hereinafter referred to as the
" Government"), as repiesented by the UNITED STATES NUCLEAR REGULATORY COMMIS-SION (hereinafter referred to as the " Coin.ission"), and VANDERBILT UNIVERSITY (hereinafter referred to as the " Contractor"),
WITNESSETH THAT:
WHEREAS, the parties desire to modify Contract No. NRC- 04-76-299 as hereinafter provided, and this supplemental agreement is authorized by lew, including the Energy Reorganization Act of 1974, as amended, and the Atomic Energy Act of l
l 1954, as amended.
NCW, THEREFORE, said contract is hereby modified as follows:
(
1.
Appendix A, attache'd to this supplemental agreement and made a part hereof, provides for the research to be performed by the Contractor during the contract period specified therein.
2.
In Article I-I - The Period of Performance, the date " September 29, 1981" is substituted for the date " June 30, 1981 3.
In Article III - Consideration, the sum "$255',978.00" is substituted for the sum "$244,978.00 ".
l l
l I
l l
l l
kdk8$$0fjoetoso4 -
NRC-04-76-r79 PDR
Modification No. 5 P
Supplemental Agreement to
~
Contract No. NRC-04-76-299 9
Page 2 IN WITi4ESS WHEREOF, the parties have executed this document.
UNITED STATES OF AMERICA BY: ? u~: J e < il s
- Kellogg V. Morton, Chief c;.
Research Contracts Branch; Division of Contracts U. S. Nuclear Regulatory Commission l
VANDERBILT Uf!IVERSITY BY: Md/
M%
Director, Division of Sponsored Research (ti tle) l J u carr I,
, certify th.t I am the I
(cttester)
Secretary of the Contractor named under this l
(title) 1 1
document; that isobert R. Applesca Who signed this (signatory) document on behalf of said Contractor was then Director, Div. of Sponsored Research of said Contractor; that this document was duly signed for and on behalf of said Contractor by authority of its governing body and is within the scope of its legal powers.
Ill WITilESS WHERE0F, I have hereunto affixed my hand and the seal of said Contractor.
'g q%.
- )
- ';
l (SEAL) b
" - - - - - - +-
7 w ~ m ac. m v
t Contract No. NRC-04-76-299
')
CC'iTRACTOR:
VANDERBILT UNIVERSITY APPENDIX A For the Contract period July 1,1981 through September 29, 1981 Article A-I RESEARCH TO Bd PERFORMED SY CGMTRACTOR (a) The unclassified scope of work under this contract entitled, " Study of Near Surface Geology of Rcelfoot Lake District of the New Madrid Earthquake Region" is as follows:
Reports on earth resistivity and shallow subsurface and surface geology shall be completed.
Contractor shall continue perform. ce of activities stated in this contractual agreement's Appendix A for t. preceeding period July 1, 1980 through June 30, 1981.
(b) y Tne Principal Investigator expects to devote the following approximate amount (s) of time to the contract work:
Richard G. Stearns - 100% of his time for 2 summer months and
,15% of his time for 1 academic month, ARTICLE A-II y!AYSANDMEANSOFPERFORMANCE (a)
Items for which support will b2 provided as indicated in A-III, below (1)
Salaries and Mages
$ 8,266.00 (2)
Equipment to be purchased or fabricated by the Contractor
$ t (1)
Travel (i)
Domestic 500.00 (ii)
Foreign
$ (4)
Other direct costs including fringe benefits (5)
Indirect costs based on a predetermined rate of 46 percent applicable to MTDC (Modified Total Direct Costs).
MDTC equals total direct costs less(l) permanent equipment, (2) subcontracts greater than $25,000, (3) computer charges, (4) fee remissions, (5) tuition and fees, and (6) external conferences.,
t
Modificction No. 5 Supplemental Agree.T.ent o _ i
.,/
~
Contract No. NRC-04-76-299 Appa'ndix A Page 2 (b)
Items, if any, significant to the performance of this contract, but excluded from computation of Support Cost and from consideration in r
proportioning costs:
None (c)
Time or effort of Principal Investigator (s) including indirect costs and fringe benefits contributed by Contractor but excluded from com-putation of Support Cost and from consideration in proportioning costs:
None Article A-III ESTIMATED NRC SUPPORT COST The total estimated cost of items under A-II(a) above for the contract period stated in this Appendix A is $22,000.00
- the Commission will pay 100 percent of the actual costs of these items incurred during the contract period stated in this Appendix A, subject to the provisions of Article III and Article B-XXVIII.
The estimated NRC Support Cost for the contract period stated in this Appendix A is $22,000.00 The estimated NRC Support Cost is funded as follows:
(a)
Estimated unexpended balance from prior period (s) 7,000.00 (b)
New funds idr the current period
$ 15,000.00 (c)