REUTER-STOKES, INC.
To: Sreniawski D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20010C151 List:
References
NUDOCS 8108190193
Download: ML20010C156 (2)


Text

_-_

P reuter$ stokes 18530 South Miles Parkv/ay, Cleveland, Ohio 44128 U.S.A.

  • Telephone (216) 5R19400, Telex 98-5253 July 31,1931 Mr. D. J. Sreniawski, Chief Materials Radiation Protection Section 2 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Reference:

Letter dated July 10, 1981 l

Lacer.se No.'s 34-18233-01, 34-18166-01, and SNM-1826

Dear Sir:

l In accordance with the provisions of 10 CFR 2.201, we are submitting the following corrective action to the three points of non-compliance detailed by W. J. Slawinski in his inspection of our facilities on June 24 and 25,1981.

1) Our procedure RS-SOP-880.2, Procedure for Wipe Testing of Radioactive Sources, dated 2-8-78, will be revised by August 30, 1981, tc include the use of a NaI system, as described in Section 1.3.1, Attachment for Items 10 and 11, of our by-product license application dated May 26, 1978, License number 34-18156-01. A calibration source, or sources, will be purchased by August ";,1981, to calibrate that system for the analysis of w e tests of beta and/or gamma emi tting material. We will require this additional time to complete our evaluation as to source types, size, and availabili ty.

The revised procedure will go into effect.is soon as the calibrated source (s) arrives in plant.

2) We will prepare a chart to be filled in by the person responsible to do the ueekly radiological survey, and post it in a place that will remind us that a weekly survey is necess ary. This weekly survey will start on Monday, k:gus t 10,1981.

P108190193 810811 R @O N

AUG 3 1981

.18530 Soum Miles Parkway

' Ckweland, Ohio 44128 U.S. Nuclear Regulatory Commission July 31,1981 Mr. D. J. Sreniawski, Chief Page Two

3) The five " safety-ray" americium-241 sources that were not wipe tested because they were in storage will be immediately added to our list of sources to be wiped on a quarterly basis. They l

will receive an initial leak check no later than Friday, August 7, 1981.

I affirm that the statements above are tnieand I will bear the responsibility to see that all corrective action is implemented on or before the dates stated above.

1 Sincerely, i

REUTER-STOKES, INC.

d o

i Vice President, Operations i

Radiation Safety Officer i

GP:jw l