Interim Deficiency Rept Re Terminations to Receptacles on GE Panels.Problem Corrected in Control Room.Action to Be Taken on GE Supplied Panels in Relay Room Undetermined.Next Rept by 811125
ML20010B602
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/31/1981
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-54-131, NUDOCS 8108170313
Download: ML20010B602 (1)


Text

'

A&&/do.5,sy

~

Donald A. Wells y

"g y Aswaate Edison in'iE==

July 31, 1981 g

D ] g y08f A, '-_

Mr. James G.

Keppler, Director 2

C k - %s,g%IE@rce Region iII U. S. Nuclear Regulatory Commission 4

799 Roosevelt Road e,

Glen Ellyn, IL 60137 b

3 N

OT

Dear Mr. Keppler:

Interim Report of 10CFR50.55(e) Item on Terminations to Receptacles on G.E. Panels (Relay Room)

(#27)-

This additional intarim report on the terminations to receptacles on G.E. panels problem has been prepared to provide you with the current status of this problem.

The problem was ini tially reportec by Detroit Edison's Mr. H. A. Walker, 8

Supervisor-Construction Quality Ar surance, to Mr. P.

f.. Barrett of NRC Region 111 during an NRC on-site inspection.

It had been noted at that-time that a number of wire connections to the terminations on the receptacles of some G.E. supplied panels in the Enrico Fermi 2 Control Room appeared to be loose.

Subsequent investigation revealed that this problem also exis ts in G.E. supplied panels in the Fermi 2 relay room.

The problem has been corrected in the Cc,ntrol Room; however, action to be taken on the G.E. supplied panels in the relay room has not yet been determined.

Evaluation uf this problem to determine an acceptable resolution is continuing.

Another report on this item, either interim or final, is scheduled to be sent to you on or before November 25, 1981.

If you have questions concern-ing this matter, please contact Mr. H. A. Walker, Supervisor-Construction Quality Assurance.

Very truly yours, J2, l'

HAW:mb pri Ss

  • 8108170313 810731-PDR ADOCK 05000341)i S

PDR/

6 ggg\\

bgg

- 4 11

' Mr. Jamts G. Keppler, Director July 31, - 1981 Page Two EF2-54131 cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement-Division of Reactor. Inspection Programs U.S. Nuclear Regulatory Comniss. ion Washington, D.C. 20555-1 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccunission -

Resident Inspectors Office 6450 North Dixie Highway l

Newport, Michigan 48166 i

4 i

S s

t X

I l

i

(

I l-i I

^

of C

r

-v--

4 5-i - - -

t 4'*'-

+ + - -

  • a --- -, -

-e*rw-

-4

--- + --