Responds to Generic Ltr 81-01, Qualification of Insp,Exam & Testing & Audit Personnel. Commitments to Reg Guides 1.58 & 1.146 & Exceptions to ANSI N45.2.6-1978 Discussed
ML20010A919
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/05/1981
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.058, RTR-REGGD-01.146, RTR-REGGD-1.058, RTR-REGGD-1.146 GL-81-01, GL-81-1, NUDOCS 8108130110
Download: ML20010A919 (8)


Text

.

BALTIMORE G AS AND ELECTRIC COMPANY P.O. B O X 147 5 B A LTIM O R E. M A R YL A N D 21203 ARTHUR E. LUNDVALL,JR.

Vict Passiormt

som, August 5,198; 6

ED B

'e U.S. Nuclear Regulatory Commission

[ TOG J g 7 A -g Office of Nuclear Reactor Regulation 3,g,km$roer Washington, DC 20555 7,

ATTENTION:

Mr. Darrell G. Eisenhut, Director s

W,.,

Division of Licensing q

SUBJECT:

Generic Letter #81-01

" Qualification of Inspection, Examination, and Testing and Audit Personnel" Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2, Docket Nos. 50-317 & 50-318 Gentlemen:

As requested by your letter of May 4,1981, enclosed is Baltimore Gas and Electric Company's response.to the referenced subject. The Baltimore Gas and Electric Company intends to commit to the regulatory positions presented in both ANSI Standards with the exceptions listed in the enclosures to this letter.

Should you have further questions regarding this matter, please do not hesitate to contact us.

Sincerely yours,

)

/

')

_. /

l;'/

whlb Vice Presi ent-Supply AEL/DWL/gla Enclosures (2) cc:

J. A. Biddison, Esquire G. F. Trowbridge, Esquire Director, Office of Inspection & Enforcement R. E. Architzel, Lesident NRC Inspector I

g0 0108130110 8100U5 I

,4, I PDR ADOCK 05000317

<j PDR

ENCLOSURE (1)

COMMITMENT TO REGULATORY GUIDE 1.58, REVISION 1 The Baltimore Gas and Electric Company is committed to ANSI N45.2.6-1978, as modified by the exceptions listed below. As requested in your Generic Letter 81-01, our commitment to ANSI N45.2.6-1978 will be modified to include the provisions of regulatory positions C.5, 7, and 10 as described in Regulatory Guide 1.58, Revision 1.

These positions will be implemented by April 1, 1982. Personnel who have qualified in accordance with the existing systems as Level I, II, and III Inspectors, Exrainers, or performers of tests will not be required to requalify under the rew guidelires.

The Baltimore Gas and Electric Company has agreed to qualify inspection, examination and test personnel in accordance with the provisions of ANSI N45.2.6-1978 or ANSI N18.1-1971. These two standards provide adequate guidance for education and experience of the before mentioned personnel.

Therefore, Regulatory Position C.6 is unnecessary.

Regulatory Position C.8 apparently requires training of personneh regardless of the magnitude of expected exposure. Therefore, even instances where expected exposure is very low, personnel performing inspections, examinations, and tests would be required to participate in training sessions concerning radiation protection and dose reduction.

Such overtraining would reduce the effectiveness of training conducted when expected doses are high.

Therefore, Baltimore Gas and Electric will not commit to Regulatory Position C.8.

Instead, a formal program for keeping radiation exposure as low as reasonably achievable will be developed and implemented for all radiation workers at the Calvert Cliffs Nuclear Power Plant prior to April 1, 1982.

EXCEPTIONS TO ANSI N45.2.6-1978 ITEM 1 REQUIREMENT Subsection 1.2 states in part, "The requirements of this standard apply to personnel who perform inspection, examination, and tests during fabrication prior to and during receipt of items at the construction site, during construction, during preoperational and start-up testing, and during operational phases of nuclear power plants".

RESPONSE-A Personnel of Baltimore Gas and Electric's Quality Assurance Department who perform inspections, examinations, and tests at the plant site during operational phases of the nuclear power plaat are required to be qualified in accordance with ANSI N45.2.621978. All other Baltimore Gas and Electric personnel who perform inspections, examinations, and testing functior.s associated with normal operations of the plant are to be qualified either to ANSI N45.2.6-1978 or to ANSI N18.1-1971.

ENCLOSURE (1)

EXCEPTIONS TO ANSI N45.2.6-1978 (CONTINUED)

Reason-A 1.

The individuals who perform inspection, examination, and testing functions associated with normal operation of the plant, such as maintenance and certain technical reviews, are normally qualified to ANSI N18.1-1971.

2.

Such testing activities conducted during normal operation of the plant, such as surveillance testing, do not require that test per-sonnel meet the requirements specified in paragraph 4.5.3 of ANSI N18.1 for technicians. Personnel qualified to ANSI N45.2.6 are adequately qualified to conduct such testing.

Response-B Baltimore Gas and Electric will not always require supplier personnel performing in ection or test activities to comply with the requirements of ANSI N45.. 6, but will evaluate the need for invoking ANSI N45.2.6 on the supplier during the review of procurement documents. The require-ments will not be applied to Commercial Quality or Catalog methods of procurement.

Reason-B Baltimore Gas and Electric's position is as follows:

1.

For replacement items purchased by the Catalog, Commercial Quality, and Verification methods of procurement, the purchaser is unable to specify the qualification requirements for inspection, examination, and test personnel because the items are manufactured before place-ment of the Purchase Order.

2.

For the Specification method of procurement, the qualification require-ments for inspection, examination, and test personnel shall be determined by:

a.

Item status (new or replac_. ent) b.

Complexity and importance of item c.

Manufacturer's QA program approval level (Appendix B, ANSI N45.2, etc.)

Pasponse-C Baltimore Gas and Electric will not require personnel who perform specific limited and repetitious inspection functions, such as inspectioc for removal or replacement of snubbers, to be trained as required by ANSI N'.5.2.6.

ENCLOSURE (1)

EXCEPTIONS TO ANSI N45.2.6-1978 (CONTINUED)

REASON-C Inspections, examinations or tests of a limited or repetitious scope need not be performed by individuals qualified to the requirements of ANSI N45.2.6 provided that they receive inatruction in the following:

1.

Activities to be verified 2.

Acceptance criteria 3.

Method of documenting results-4.

Method of reporting deficiencies The person responsible for the inspection activity shall ensure that aucl.

inspection is given to inspectors before they perform the specific inspection functions, and that both this training and the acceptability of the results of the incpection are documented..

RESPONSE-D When it is necessary,to monitor the activities of a supplier, Baltimore Gas and Electric will use personnel qualified as auditors in accordance with ANSI N45.2.12 or inspectors in accordance with ANSI N45.2.6.

REASON-D Both ANSI N45.2.6 and N45.2.12 establish training requirements suitt, e for monitoring supplier activities.

ITEM 2 REQUIREMENT Table 1 specifies that Level III personnel shall be capable of qualifying Level III personnel.

RESPONSE

Where there is only one Level III position or when a new Level III position is created, Baltimore Gas and Electric personnel with the title General Supervisor or higher shall qualify Level III personnel.

-REASON Baltimore Gas and Electric personnel in these grades are capable of certifying Level III personnel without being trained as Level III inspectors.

~.

t ENCLOSURE-(2)

COMMITMENT TO REGULATORY GUIDE 1.146 (AUGUST 1980)'

~

The Baltimore' Gas and Electric Coripany intends to commit to the regulatory position on ANSI N45.2.23 (1978) that is described in Regulatory Guide 1.146, with the. following alternatives to Sectic a. 2.3.and 3.3 of.the referenced

. standard.

REQUIREMENT 2.3 QUALIFICATION OF LEAD AUDITORS-Section 2.3.1-requires prospective' Lead Auditors to obtain a minimum of' ten credits under the scoring system defined in paragraphs 2.3.1.~1-2.3.1.4.

RLSPONSE Baltimore Gas and Electric intends to revise-the scoring syse m to the-s following:

Education and Experience The prospective Lead Auditor shall have accumulated a minimum of ten credits under the following scoring system:

1.

Education (4 credits maximum)-

1.1 For the Associate's degree from an accredited institutionj

~

score'one credit; if the degree is in. engineering, physical sciences, mathematics, or' quality assurance, score two.

credits. For the Bachelor's degree from an accredited-institution, score two credits; if the degree is-in engineering,.

. physical sciences, mathematics, or quality assurance, score three credits.

1.2 For the Master's degree in engineering,. physical sciences, i

i business management, or quality assurance from an accredit'ed

.i l

institution, score (as credit.

f.

1.3 For the successful :ompletion of part of the reauired curriculum for an tssociate's, Bachelor's, or.haster's degree, ' score a corresponding percentage of ' the credits -

specified above for. the degree.

t i.4 For the successful completion of Navy Nuclear Training,.

its equivalent in anotherl armed service, or the training

-required for becoming a licensed operator at a commercial nuclear power plant, score two credits.'

}.

i-m

\\

ENCLOSURE (2)

COMMITMENT TO RF.GULATORY GUIDE 1.146 (AUGUST 1980) 2.

Experience (9 credits maximum) 2.1 Technical Experience For experience in engineering, manufacturing, construcrion, operation, or maintenance, score one credit for each full year.

2.2 Nuclear Experience If two years of the technical experience have been in the nuclear field, score one additional credit.

2.3 Quality Assurance Experience If two or more years of the technical experience have been in quality assurance or quality control, score two additiona.

credits.

Persons whose work activities are controlled by the Quality Assurance Program, but who are not full-time members of the QA organization may be awarded half the credits that would be given to a person with specific quality assurance experience.

2.4 Audit Experience If two or more years of the technical experience have been in auditing, score one additional credit.

2.5 Supplemental Experience Persons who have a proportion of the experience specified in 2.1-2.4 may be awarded a corresponding percentage of the credits specified.

3.

Training (2 credits maximum)

Persons who have successfully completed the training requirements of ANSI N45.2.23 may be given two credits.

4.

Rights of Management (2 credits maximum)

The Quality Assurance Manager may grant additional credits for other performance factors applicable to auditing as follows:

4.1 For certification of competence in enginee ring or science related to nuclear power plants, or in quality assurance specialties, issued and approved by a State Agency or National Professional or Technical Society, score two credits.

+

.a 4

i ENCLOSURE (2) t l COMMITMENT TO REGULATORV GdIDE 1.146 (AUGUST 1980) v 4.2 For nuclear experience in exces.9 of two years, score one credit-for each two years of e:.perience.-

1 4.3 For practical experience that_can-be related to-power plants, in excess of five years, score one credit for each two years of experience.

REASON Baltimore Gas and Electric is in agreement with the basic purpose of ANSI N45.2.23, that is, to establish minimum educational or' experience require-ments for Lead Auditors. We think, however, that the system of credits outlined in ANSI N45.2.23 tends to reduce the size of the pool of potential l:

replacement auditors without making redeeming improvement in the capabilities of the persons selected..

i

.ansider the ' law in the current system to be the emphasis an educational

_quirements that will allow a person with a Master's degree and no nuclear or power planc experience to become a Lead Auditor, but will exclude a person who has no degree, even though he may have 20 years' experience in operating or maintaining nuclear or power plant systems.

The practical balance between education and experience will vary with

~

i individuals and particular work assignments. Any attempt to establish' rigid requirements is likely to allow some unsuit'able candidates to. meet-1 l

the qualification requirements while excluding some acceptable candidates.

i l

REQUIREMENT l

3.3 REQUALIFICATION Lead Auditors who fail to maintain their proficiency fo'r'a period of two years i-or more shall be required to requalify. Requalification shall include retraining in accordance with the requirements of paragraph 2.3.3, reexamination in accordance with paragraph 2.3.5, and participation as an i

Auditor in at least one nuclear quality assurance audit.

I

RESPONSE

Baltimore Gas and Electric intends to requalify Lead Auditors on the basis I

of the satisfactory performance of one audit as observed by a' qualified l-Lead Auditor.

t.

Il' REASON 1

The purpose of the training specified in paragraph 2.3.3 of the. Standard is to ensure that candidates understand the fundamentals of auditing and the requirements for the activities to be audited. The fact that persons have-not maintained their proficiency does not.mean that they need complete retraining; it means only that they have not been able to review and study the applicable Codes, Standards, Procedures, Instructions, and other l

documents'related to Quality Assurance programsland program auditing..

I L

- --. -x.

x----... --..

...-.-.-.L.--..-

^

ENCLOSURE (2)

COMMITMENT TO REGULATORY CUIDE 1.146 (AUGUST 1980)

Baltimore Gas and Electric. considers that the satisfactory performance of an audit under the observation and guidance of a qualified Lead Auditor should ensure that persons with lapsed certification will review and l

understand the pertinent documents.

IMPLEMENTATION The Baltimore Gas and Electric program for the qualification of audit personnel that is described above will be fully implemented by October 1, 1981.