Interim Deficiency Rept Re Calibr of Torque Wrenches, Initially Reported on 810303.QA Level I Torquing Programs Reviewed.Procedures Revised Where Needed.Purchase Orders Changed to Provide Required Control.Next Rept by 811125
ML20010A248
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/29/1981
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-54130, NUDOCS 8108110224
Download: ML20010A248 (2)


Text

ANM 4 SS(<

D>nald A. Wells Detroit N ^~ ~

2000 Second Avenue

,j \\ \\ I

[/Q

  • hCiSOnansta"'"'

3 f

N :.

L

.h L

U July 29, 1981 m2-54130 p '

m 101981, q

~

w.s.wuana M conatS5pt Thy '

,dt Mr. James G. Keppler, Director Region III U.S. Nuclear Regulatory Ccmnission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Interim Report of 10CFR50.55(e) Item on Calibration of Torque Wrenches (#40)

Dear Mr. Keppler:

This additional interim report on the Calibration of Torque Wrench problem has been prepared to provide you with the current status of this problem.

The problem was originally reported to Mr. J.E. Konklin of NRC-Region III by Detroit Edison's Mr. H.A. Walker, Supervisor-Construction Quality Assur-ance, on March 3, 1981.

Programs '?f all site contractors performing OA Level I torquing have been revieww. Deviation Disposition Requests were issued where hardware prob-lems were found. Procedures were revised 5/nere needed and purchase orders changed to provide the required control. DDR's which were written have been dispositioned to provide a 20% sampling of questionable torqued items to verify accuracy. Calibration frequencies used by the various contractors were reviewed, and in one case, the calibration interval was shortened.

Work is continuing on this problem.

Another report on this item, either interim or final, is scheduled to be sent to you on or before November 25, 1981. If you have questions concern-ing this matter please contact Mr. H.A. Walker, Supervisor-Construction Quality Assurance.

Very truly yours, 0 Qg4 a

) g lj DAW / HAW /cp 0108110E24 810727 j

DRADOCK05000g g

6@

WB

Mr. James G. Keppler, Director July 29, 1981 Page Two EF2-54130 cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement bivision of Reactor Inspection Programs U.S. Nuclear Regulatory Ca mission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Comission 6450 North Dixie Highway Newport, Michigan 48166 i