ML20010A137

From kanterella
Jump to navigation Jump to search
Forwards LER 81-018/03L-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML20010A137


LER 81-018/03L-0:on 810625,pressure Switch NBI-PS-52A Found W/Trip Point Less Conservative than Tech Spec.Apparently Caused by Setpoint Drift.Switch Readjusted.Setpoints for Switches Reset
ML20010A139
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/22/1981
From: Marker D
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20010A139 (2)
Forwards LER 81-018/03L-0.Detailed Event Analysis Encl
ML20010A136
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/22/1981
From: Lessor L
NEBRASKA PUBLIC POWER DISTRICT
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20010A136 (2)