Responds to Bradford 810714 Memo Re Ceiling Panels in Control Rooms.Util Has Made All Reasonable Efforts to Expedite Delivery & Installation & Taken Compensatory Measures Until Installation Complete
ML20010A104
Person / Time
Site: Browns Ferry, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/03/1981
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Bradford P, Gilinsky V, Palladino N
NRC COMMISSION (OCM)
Shared Package
ML20010A105 List:
References
NUDOCS 8108110070
Download: ML20010A104 (8)


Text

gp i'

AUG 0 31981 i

l s/s f

\\

MEMORNIDUM FOR: Chairman Palladino Comissioner Gilinsky Comissioner Bradford t, i,UG 0 51981

  • 9 k

u.s. g 7 Commissioner Ahearne 2

FROM:

William J. Dircks, Executive Director h

{f for Operations s

l

SUBJECT:

CEILING PMlELS IN BROWfiS FERRY CONTROL ROOMS This is in response to Comissioner Bradford's menorandun of July 14, 1981' on the above subject. This memorandum asked whether TVA's schedule for replaconent of the ceiling tile at Browns Ferry was acceptable to the staff and that the basis supporting our decision be provided.

As stated in Comissioner Bradford's memorandum, TVA comitted (in their letter of May 22, 1981) to replace the existing suspended ceiling tile with lighting panels which are the same as those approved by the staff for Sequoyah.

We have been pursuing this matter through frequent discussions with TVA. TVA advised us that they contacted 15 prospective vendors. The vendor selected had the shortest delivery date. Because of the time required to fabricate the custo% designed system to the quality assurance and certification require-cents, the best quoted delivery date is the week of September 28, 1981. TVA~

plans to start installation of the new lighting systen upon roccipt of the raterials. This installation is not simply a r:atter of replacing ceiling panels.

The new grid system has to be installed to ecct seismic requirenents and requires extensive rewiring. TVA estimates it will take approximately 6 weeks to complete the control rooms. All panels will be replaced except for those directly over the control consoles. TVA estimates these panels to comprise about 10-15% of the total ceiling space. For safety reasons, the latter will be replaced during the next outage of sufficient duration to effect the modifica-tion; in no case, will this extend beyond the next refueling outages. Unit 3 is scheduled to be down for refueling from Septerber 1981 to January 1982, so all panels will be replaced in this unit prior to startup. Unit 2 and 'Init 1 will be completed no later than July 1982 and May 1983 respectively.

In discussions with TVA management (L. Hills), the staff was assured that the remaining ceiling tile replacements would be acconplished at the earliest opportunity when the units would be down for 5 days.

While the schedule for replacement of the existing ceiling panels at Browns l

Ferry is not as soon as all of us would like to see, we have concluded that TVA has nade all reasomble efforts to expedite delivery and installation.

Along with TVA, we have explored various alternatives. The existing ceiling panels.cannot be removed and left out because they serve as the air plenum diffusers and the glare from the non-diffused light might cause an operator i

I OF FICE )

8108110070 810803-m.m. ~.

PDR ADOCK 05000259 sunucue>

p p yg. -. --_.

....................l..................l................

ocn >

, hac ronu va no-son nacu eno OFFICIAL RECORD COPY usam e-m.m

[

l 2-difficulty in reading instruments on-the c-trol panels.. Until the new panels l

are installed, TVA has inplemented ewS o precautions to prevent a fire in the control room and the operators ht,e been alerted to the potential problen and the need for prompt action if any unusual conditions are noted. Coupled with these compensatory measures, we conclude that the proposed schedule for replacement of the ceiling panels at Browns Ferry is reasonable and the best attainable and that continued operation does not present a hazard to-the public health and safety.

(Sig)V!illi2.m ).Dirckl William J. Dircks Executive Director for Operations cc:

SECY OPE 0 04 Distribution:

Docket File S. Hanauer NRC PDR R. Mattson Local PDR T. Murley EDO Reading D. Vollmer D. Eisenhut B. Snyder-TMIP0 R. Purple P. Fine - TCSB J. Heltemes, AE00 S. Cavanaugh C6Do l%81)

OELD M. Bridgers, ED0 Program Support Staff, NRR E. Hughes M. Stine S. Norris R. Clark T. Ippolito T. Novak E. Case i

H. Denton l

W. Dircks K. Cornell T. Rehm V. Stello PPAS

  • See previous page for concurrences.

%h/

  • DL:0RB#2 *DE:CEB
  • DL:0RB#2 *DL:AD:0R*DL{DepDir RClark:pob RFerguson TIppolito TNovak RPdrple D i enhut se 7/ /81 7/ /81 7/ /81 7/ /81 7/ /81 7

/81

/p81 NRf E00 HD ton WJDircks omce >

7 gg--.7 /,j l 81+:

" ~ ~ -

- -~~"~ ~~

- ~ " ~ ~ ~ -

---~

~

~

~ ~ ~ -

~ ~ ~ ~ -

sunsue >

..L...............

omy

nne ronu ais tio-so> Nnm a OFFICIAL RECORD COPY usom mi-m..eo O

j 4 ;

N, l

a

~

. these compensatory measures.- we conclude th, t the proposed schedule for rep. eccent of the ceiline! panels at Browns Fer is reasonable and the best +tainable and that continued operation es not present a hazard to l

the pub ic health and safety.

Willian J. Dircks Executive Director for Operations j

cc: SECY l

OPE-j OGC l

\\

Distribution:

\\

Docket File

$s Hanauer-flRC POR R.* 'attson Local PDR T. tirley b

EDO Reading D. Vollper D. Eisenhut B.Snydh(-TMIPO R. Purple P. Fine gTCSB J. Heltemes, AE0 S. Cavanau h OElb it. Brideers, O

Progran Supp t Staff, MRR j

E. Ilughes li. Stine-S. tiorris R. Clark T. Ipp ito T. !!o ak E. C.se

11.,enton W.

ircks K Cornell

. Rehn V. Stello PPAS l

I f

{h{l Q

I :DepDir D:DL HRR DC DL:0R' D

EB DL:3"".2 DL:AD:0R l

RClar RFe%uson Tu_ rpo, to T!!o k RPurple DEisenhut ECase 7/2z/8 7/'IM81 7'h.'/81 '

7/

1 7/g181 7/ /81 7/ /81

/

E.!.9............

omeet......tlRR.........

HDenton l 'JDircks su:mus >..... 7.... 733...o7....g.

f omy O nne rosu sia paomacu oua OFFICIAL RECORD COPY usa m m i

-m. sea

ROUTING AND TRANSMITTM SLIP TO: (Name, office symbol, room number, initials Date building, Agency / Post)

D. Eisenhut 3,

2.

3.

4.

S.

Mion l File Note and Return

_pproval For Clearance Per Conversation As Requested For Correction Prepare Reply -

Circulate For Your Information See Me l

Comment investigate Signature Coordination Justify REMARKS l.

Novak talked to Larry Mills who agreed TVA would make changes at earliest opportunity (any outage greater than 5 days duration).

';ence to the effect

~

has been added to

hird paragraph.

v 2.

Addressees are per Cas '

request.

(example attached) Q l

DO NOT use this form as a RECORD of approvals, concurrences, disposafs,

_,.plearances, and similar actions FROM:(Na,

r'. '/%f, Agency / Post)

Room No.-Bldg.

/

338 ooneyforDiqkClark V.

Phone No.

29787 I

W 1-102 OPTIONAL FORM 41 (Rev. 7-76) c u IN-11.206

  1. ~

tt

--m_. c.ovi v., m m.~aorr.cr in -.n.oies.

.a..

. - - +

w' Date ROUTING AND TRANSWTTAL SUP 7/ 22/ 81 TO: (Name, office symbol, room number, initials Date building, Agency / Poet) Ni-h 7/22.

D

h d 2 w=

%~

G ?;'p1 s' Lu^-

Yf,1, fz R. Pur01e - D. ' Eic:anhist Uh p

e W o @ 7/29 Action '

File Note and Return Approval For Clearance Per Conversation As Requested For Correction Prepare Reply Circulate For Your Information See Me Comment investigate Signature Coordination Justify REMARKS W. J. Dircks GREEN TICKET NO.10681

Subject:

CEILING PANELS IN BROWNS FERRY CONTROL ROOM i

9$ % F h

bNy^.

(A Ww&A

+s l.bh 9VV7y DO NOT use this form as a RECORD of approvals, concurrences, disposals, clearances, end similar actions FROM:(Name, org, symbol. Agency / Post)

Room No.-Bldg.

338 D. Clark - ORB #2

%,,, go, 29797 5041-102 OPTIONAL FORM 41 (Rev. 7-76)

Prescribed b GsA N"N gn= cm.psusurrarmuno orrier iere-aao-se eia

r*

^

\\

1 t.:

Date ROUTING AND TRANSMITTAL SUP TGs (Neme, onice symbol, room number, inniele Date Du6 Ming, Agency /WR) 1.

1 l

4.

S.

Action I File Note and Retum Approval For Clearance Per Conversation As Requested For Correction Prepare Reply Circulate For Your Information See Me Comment investigate Signature Coordination Justify StEMARKS rg..

[

b%

CM CA M

uue dah Oau 'ut blo itEga [d A

(/\\

Llul F gk M

DO NOT use this form as a RECORD of e.,provals, concurrences, disposals, clearances, and similar actions FROM:(Name, org. symbol, Agency / Post)

Room No.-Bldg.

l Phone No.

50s1-102 OFTIONAL FORM 41 (Rev. 7-76)"

e cro neo o - su-ns m gg.bg, r-

oe,,

ROUTING AND TRANSMITTAL. SLIP, g jgj 5 (Name. ONice symbol, room number, -

lnitials Date building, Agency / Post) 1.

l m>=4

\\ AY 3.

uO nw

/

yi 3.

N

/

4.

A

/

/

V Action File Note and Retum i

Approval For Clearance Per Conversation As Requested For Correction Prepare Reply Circulate For Your Information See Me Comment -

Investigate Signature Coordination Justify REMARKS

^

Wu M' f

f,. c_-- pp" wm h; j%

u$,4 "N

?

f.Ao r y A ' V gfandw 6A~ S/

gy

+

g lj js %GLCL

~"

w as 4f f y$slA~#h p

psAL e

DO NOT use this form as a RECORD o(ve4v f approv, concurrences, disposals, clearances, and similar actions FROM: (Name, org. symbol, Agency / Post)

Room No.-Bldg.

.X t4 Phone No.

6041-102 OPTIONAL FORM 41 (Rev. 7-76)

RYE t"(UcIfu 1N-11206

.... c o

~r m..~a orr.c 1.--neo... no y

4 ACTION CONTROL DATES CONTROL NO.-

i h f;h f-

-O 9-COMPL DEADLINE,

pm pgg g

g AC KNOWLC OGM ENT'

' " ' ' ~ '

DATE OF DOCUMENT

,tg g g,g INTERIM REPLY l'

TO:

PREtM"TUEt SIGNATURE p

Circkss FINAL REP!.Y gh CHAIRMAN -

%U f l /.-

O EXECUTIVE DIRECTOR FILE LOCATION OTHER:

DESCRIPTION O LETTER O MEMO ' O REPORT O_OTHER SPECIAL INSTRUCTIONS OR REMARKS

.)

r questions re remostas ee11 tag panels C

1b<'

in control reen of B wv uns % and PRIORITYs f CLASSIFIED DATA OOCUMENT/ COPY NO.

C LASSIFICA T' sNl i "'

~

NUMBER O? PAGES CATEGOR*

POSTAL REGISTRY NO.

O NSI _-O Ro O FRD

}

ASSIGNED TO:

DATE INFORMATION ROUTING LEGAL REVIEW D FINAL O COPY AS$1GNED TO:

DATE NO L EGAL OBJECTIONS my

..u pj

-McCks Case NOTIFY:

~ - - - - - -,.,. i h, *,

. l

'Mutj/-

7/16/51 E?

Denton O'

^"'"'C RRES BR

,x, b N

^[4

/ 4-t L ((f __

jg,}j, 6.

swg COMM ENTS, NOTim j

2.

I!annuer p, pg Ext 3.

Matts 41CAE NOTIFICAflON RECOMMENDED:

O vEs O NO RR(FORM 232

-EXECUTIVE DIRECTOR FOR OPERATIONS 00 NOT REMOVE THIS COPY PRINCIPAL CORRESPONDENCE CONTROL 1

.