Text
I 3
l r\\n Docket No. 99900317/81-01
,,yQ
/Q -
f./'O m/
s
~
Cooper Industries, Inc.
2 O f8 I;
' h 'S h% )O yp 3
Cooper Energy Services Division, 6-7; g
8.'
C-B Reciptocating PMf0Hs
/'
ATTN: Mr. C. C. Bemiller gWo'g-)[,
Y/
Manager, Quality Aontrol 150 Lincoln Grue City, PA 16127 Gentlemen:
This refers to the QA program inspection conducted by Mr. Ross L. Brown, of this office, won June 1-5, 1981, of your facility at Grove City, Penn-sylvania, and to the discussions of our findings with Mr. C. H. Patterson and mbabers of your staff at the conclusion of the inspection.
This inspection was made to confim that, in the areas inspected, your QA poogram is being effectively implemented. The inspection effort is not designed to assure that Unique quality requirements imposed by a customer are being achieved; nor to assure that a specific product, component, or service provided by you to your customers is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsi-bility for the quality of specific products, components, or services pro-cured from others. You should, therefore, not conclude that the NRC's inspection exempts you from inspectionssby an NRC licensee or his agents, nor from taking effective corrective action in response to their findings.
Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examina-tiori of prccedures and representativestrecords interview?
.th personnel, and obeervations by the inspector.
Within the scope of this inspection, we found no instance where you failed to meet NRC iequirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inppection report will be placed in the NRC's Public Document Room.
If this report contains any infomation that you believe tb be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary T
8108110061 810707 PDR OA999 EMVCOIN 99900317 PDR
,' ','c E l.9E
.M.
.......(
o CI:CS
-$C:CS BC:VIB D:E&,
DQ '
,y p p:!P/81 RLBrown/rf" DEWhitesell- "UPotapovs-dEG iardo-11 ins
,y...'
' " >.6/22/81
.. m./81 60?81 6hd8.1..
Nnc rosu ais no-so> Nacu 024o OFFICIAL RECORD COPY o
9 e
3 S.
3 Cooper Industries, Inc.
Docket No. 99900317/81-01
=2-that you (a) notify this oft 7:e by telephone within 10 c.
from the date of this letter of your intention to file a request for witnholding; and (b) submit within 25 days from the date of this letter a written applica-tion to this office to withhold euch infomation.
If your receipt of this letter has been delayed such that leis than 7 days are available for your review, please notify this effice promptly so that a new due date may be established. Consistent with section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the informa-tion which identifies the document or part sought,o be withheld, and which contains a full staternent of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section further reciuires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The infomation sought to be withheld shall be incorporated as far as possible into a separate patt'ofithe affidavit. if-we do not hear from you in this regard within the specified periods notdd above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be plaseed to discuss them with you.
Sincerely, Uldis Potapovs, Chief Vendor Inspection Branch
Enclosure:
Inspection Report No. 99900317/81-01 bec:
IE:V&SPB (Reinmuth)
IE Files AE0D NMSS NRC:PDR QAB Reg. Directors, I, II, III, V JEGagliardo ASME NBBAPVI CFF ECE >
sumaut)
JvChtfADJEL,1Nao s US'TO 1980-329 824