'A@
(412) 456-6000 435 Santh Avefwe P ttsburgh. Pa.
l July 10, 1981 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Attn: Boyce H. Grier, Regional Director Region I s
631 Park Avenue King of Prussia, Pennsylvania 19406
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 IE Inspection Report No. 81-04 t
j Gentlemen:
In response to your letter of June 17, 1981, and in accordance with 10CFR 2.201, the attached replies address the Notices of Violation which were included as Appendices A and B witl' the referenced Inspection Report.
In addition to the need for corrective action regarding specific items of noncompliance, your letter expressed concern about the implementation of our management control systems that permitted them to occur. We have recently established a Nuclear Division with the goal of improving manage-i ment control. The reorganization has provided additional lines of super-vision which will permit closer management control and awareness of each departments' programatic requirements.
Since the Reply to Notice of Violation, Appendix B, contains information subject to Section 2.790 (d), Title 10, Code of Federal Regulations and is, therefore, exempt from disclosure, it is my understanding that this portion of this 81-04 response will not be placed in the Public Document Room and will receive limited distribution.
]
If you have any questions concerning this response, please contact my office.
Very truly yours, i
J. J. Carey.
Vice President, Nuclear Attachments: Reply to Notice of Violation, Appendix A Reply to Notice of Violation, Appendix B 8108100413 810731 PDR ADOCK 05000334 e
PDR 2
o
B'eaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 IE Inspection Report No. 81-04 Page 2 cc:
Mr. D. A. Beckman, Resident Inspector U.S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 1
L-
..)
1 COMMONWEALTH OF PENNSYLVANIA)
) SS:
COUNTY OF BEAVER
)
O day of b
/9[/
, before me,bn thi, /4/6 d
ch-, a Notaff Pubfic in and for said Commonwealth and' County, personally appeared J. J. Carey, who being duly sworn, deposed, and said that (1).ie is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.
1 ar+rer JUDITH D. ANTHONY, Notary Public Shippingsort lorough, Seaver Co., h My Commission Espires Dec. 12, 1983
DUQUESNE LIGHT COMPANY Beaver Val.ey Power Station Reply to Notice of Violation Appendix A Inspection No. 81-04 Letter dated June 17, 1981 VIOLATION A (Severity Level VI; Supplement I)
Description of Violation (81-04-03)
Technical Specification 6.8, Procedures, states, in part, " Written procedures shall be.
. maintained covering the activities referenced below:
a.
The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November 1972.
." Appendix "A" of Regulatory Guide 1.33, November 1972, recommends the following procedures: "Section C.
Procedures for Startup Operation and Shutdown of Safety Related PWR
. C.22 Process Radiation Monitoring System.
." and "Section E.
Systems.
Procedures for Correcting Abnormal, Offnormal or Alarm Conditions.
E.27 Abnormal Releases of Radioactivity.
Contrary to the above, on February 4, 1981, procedures for operation of atmospheric steam relief valve effluent radiation monitoring instrumentation were not properly maintained in that Radcon Emergency Operating Procedure (REOP) No. 1.2, Emergency Use of Atmospheric Steam Relief Effluent Monitoring System, Revision 1, posted at the equipment location did not include Revision 2 to Figure 5.1.2.3, Calibration Curves-Detector Radiation Level vs. Recorder Indication, Sheets 7-10.
The procedure cover sheet carried a validation stamp authorizing its use from September 19, 1980, through March 15, 1980, although the above pages had been superceded by a subsequent revision.
Corrective Action Taken The Radcon Supervisor initiated immediate corrective action to post current revision copies of the curves at the equipment location.
Action Taken To Pr event Recurrence A controlled copy of the subject procedure has been assigned for use at the equipmenc location.
Controlled copies of procedures require appropriate signatures to verify that procedure revisions have been received and incorporated.
Date On Which Full Compliance Will Be Achieved Full compliance was achieved as of February 15, 1981.
_ _ _ -