Provides Commitments to Meet Positions C.5,6,7,8 & 10 of Reg Guide 1.58,Revision 1 & 1.146,per Generic Ltr 81-01. Personnel Performing Insp Exam & Testing Functions Will Be Qualified to Ansin 18.1-1971
ML20009H272
Person / Time
Site: Humboldt Bay
Issue date: 07/31/1981
From: Crane P
PACIFIC GAS & ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.058, RTR-REGGD-01.146, RTR-REGGD-1.058, RTR-REGGD-1.146 GL-81-01, GL-81-1, NUDOCS 8108070132
Download: ML20009H272 (2)


Text

PACIFIC G AS AND ELECTR,IC C O M PANY 77 BE ALE STREET,31ST FLOOR, S AN FR ANCISCO, C ALIFORNI A 94106 P. o. BOX 7442 4

T E LE P H O N E (415) 781 4 211 TELECOPIER (415) 543 7813 RO B E RT CH LB AC H g3.syvyayyese ga,..

yay =.,'

f.f.f.;..g v; a[;;;,
.3.g7,o;; =* 'a vict m mne.o ar.=.no.m m......

C H A R L E S T. V A N D C U S E N

  • ' I.*
  • * "[ *

/.*..ac",.*...

e,

  • Hiu e A. C a A N E. s n.

...;=,;,.,..,,,

g,g...,,,,,,,,,

,,,,,,,,,,,,,,,,'*1"J:

""N"Yd'^""

  • .'t; *,,:3?J;'..
T3.
.,

8.ds**u*'**=****

JOHN e. G isSON 4 R T HU M L. HILL M A N, J R.

C H A N L E S W. T H i 9 3 E L L

((j[ $,$;[{*,((]

'[ [f,",,',.",1".* *,'

D A N I E L' E. 01 B S O N N "[.IS*I ['

UI[""U N

s O ((N I *[$

NEE [.*SIE[ eat.

j s Ac n F. PA L U N, J R.

{fi.*.,J. " 3'J..,

g.*t.[,ey*...

aos EpH i. n ELoy g. p,.,,,,

gn;7.g.;.

m,..

, m.mu

.'n.'.;....,

July 31, 1981

[

l Mr. Darrell G. Eisenhut, Director W

m

\\

Division of Licensing

. g.,

d Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Ccamission

(

r.*g Washington, D. C.

20555 GO1 Re: Docke t No. 50-133

  • j y

License No. DPR-7

\\

Subject:

Qualification for Inspection, Examination and Test bg and Audit Personnel IlI

Dear Mr. Eisenhut:

Generic Letter 81-01 dated May 4, 1981 requested that we furnish commitments to meet regulatory positions C.5, 6, 7, i

8, and 10 of Regulatory Guide 1.58, Revision 1, and Regulatory Guide 1.146, and our planned date for meeting those commitments.

We will comply with Positions C.5, 6, 7, 8 and 10 of Regulatory Guide 1.58, Revision 1 and ANSI N 45.2.6 - 1978 with the following exceptions: Our plant quality control inspectors and personnel performing leak-rate testing, including that required by 10 CFR 50, Appendix J, will not have the three levels of qualification. As specified in the NRC interpretation of Regulatory Guide 1.58 issued April 7, 1977, personnel performing inspection, examination, and testing functions associated with normal operations of the plant, such as surveillance testing, maintenance, and certain technical reviews normally assigned to the plant staff, will be qualified to ANSI N 18.1 - 1971.

These requirements will be fully implemented by December 31, 1981.

4b l]p 8108070132 810731 lI 0 PDR ADOCK 05000133 y

P PDR

i Mr. R. H. Engelken July 31, 1981 J

l 4

We presently comply with Regulatory Guide 1.146 dated August, 1980.

Very truly yours, I

i

(

cc: Director S

Office of Inspection and Enforcement l

U. S. Nuclear Regulatory Commission I

Washington, D. C.

20555 i

j Director j

Document Management Branch U. S. Nuclear Regulatory Commission l

Washington, D. C. 20555 h

4 I

[

i i

l l.

i 1.

I I

l

.y s+,

e ce w,,,e--_,~~v.w

.em-g%,,,..c-w,~-.r.3

...mm.-,_

r.w.,,.wmy v44-, -

,,,.--.,y---,ee.

1

-c..,--

n

-e

,y,res e--.--