Advises That Westinghouse Topical Repts Are Applicable to Facility.Conclusions Support Util Position Re Topic A-2. Updated WCAP-9558,Revision 2 Will Be Submitted in Response to NRC 801024 request.WCAP-9787 Submitted Per NRC Request
ML20009H257
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/31/1981
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-02, REF-GTECI-RV, TASK-A-02, TASK-A-2, TASK-OR NUDOCS 8108070110
Download: ML20009H257 (2)


Text

.,

0 C

[ v= N Commonwealth Edison

.j Ona First National PII2a. Chicigo, iliinois g

Address Reply to: Post Office Box 767 Chicago, filinois 60690 July 31, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 4^

N[7r h U.S. Nuclear Regulatory Commission U

.J IIU "3

Washington, DC 20555

% 8W.7 @4 AUG 0 G 1981*

Subject:

Zion Station Units 1 and 2 Asymetric Vessel Loads NRC Dockets 50-295 and 50-304

/,

%[N Reference (a):

January 25, 1980, letter from N. /4 V. Stello to All PWR Licensees.

(b):

February 14, 1980, letter from D.

L.

Peoples to A. Schwencer.

(c):

September 4, 1980, letter from W.

F. Naughton to H. R. Denton.

Dear Mr. Denton:

The following additional information regarding asymmetric LOCA loads on the Zion reactor vessels is submitted at the request of the NRC staff for their use in resolution of Topic A-2.

Westinghouse has submitted the following WCAPs to the NRC staff under cover letter NS-TMA-2455.

1.

WCAP 9558 Rev. 2 (Proprietary) " Mechanistic Fracture Evaluation of Reactor Coolant Pipe Containing a Postulated Circumferential Through Wall Crack".

2.

WCAP 9570 Rev. 2 (Non-Proprietary) " Mechanistic Fracture Evaluation of Reactor Coolant Pipe Containing a Postulated Circumferential through Wall Crack".

3.

WCAP 9787 (Propriet.ary) "Tensil and Toughness Properties of Primary Piping Weld Metal for Use in Mechanistic Fracture Evaluation.

4.

WCAP 9788 (Non-Proprietary) "Tensil and Toughness Properties of Primary Piping Weld Metal for Use in

],3N Mechanistic Fracture Evaluation.

I, si o psRSE8aN!8%i P

0 Mr. H. R. Denton July 31, 1981 These WCAPs and the conclusions contained therein are applicable to the subject dockets and support the position taken by Commonwealth Edison in the February 14, 1980, submittal, D. L.

Peoples to Mr. A. Schwencer, concerning Topic A-2.

The updated WCAP 9558 Rev. 2 is being submitted in response to a request made in the October 24, 1980, meeting of the NRC and Westinghouse Asymmetric Loads Owners Group.

WCAP 9787 is being submitted in response to a request made in a February 26, 1980, meeting with the same attendees.

One (1) signed original and thirty-nine (39) copies of this letter are provided for your use.

Please address questions regarding this matter to this office.

Very truly yours, Yr kefW T. R. Tramm Nuclear Licensing Administrator cc:

Zion Resident Inspector 1m 2360N

....