ML20009H047

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 810518-22
ML20009H047
Person / Time
Issue date: 07/10/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20009H042 List:
References
REF-QA-99900749 NUDOCS 8108050391
Download: ML20009H047 (1)


Text

.

Norwalk Fabricators, Inc.

Docket No. 99900749/81-01 NOTICE OF VIOLATION As a result of the inspection conducted on May 18-22, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violations were identified:

A.

Paragraph 21.6 of 10 CFR Part 21 states in part, "Each individual partner-ship, corporation or other entity subject to the regulations in this part, shall post current copies of the following documents in a conspicuous position on any premises within the United States where the activities subject to this part are conducted:

(1) the regulations in this part, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) pro-cedures adopted pursuant to the regulations in this part.

"If posting of the regulations in this part or the procedures adopted pursuant to the regulations in this part is not practicable... in addition to por ing Section 206, post a notice which describes the regulatic.nc/ procedures, including the name of the individual to whom reports may be made, and states where they may be examined."

Contrary to the above, posting of 10 CFR Part 21 and Section 206 of the Energy Reorganization Act of 1974, or an appropriate notice had not been accomplished.

This is a Severity Level VI Violation (Supplement II).

B.

Paragraph 21.21(a) of 10 CFR Part 21 states in part, "Each individual, corporation, partnership or other entity subject to the regulations in this part shall adopt appropriate procedures to:

(1) provide for (i) evaluating deviations or (ii) informing the licensee or purchaser of the deviation in order that the licensee or purchaser may cause the deviation to be evaluated... and (2) assure that a director or responsible officer is informed if the... basic component supplied

... (i) Fails to comply... relating to a substantial safety hazard, or (ii) Contains a defect."

Contrary to the above, procedures had not been adopted to provide for:

(1) evaluating deviations or informing the licensee or purchaser and (2) assuring that a director or responsible officer was informed if the supplied basic componcat (a) failed to comply, or (b) contained a defect.

This is a Severity Level VI Violation (Supplement II).

8108050391 010710 PDRGA999EMV**Q 99900749

-