$VL soin 417 2 Duquestie LJdit (412) 456-6000 435 Santh Avenue Pittsburgh, Pa 1
JUL 31 981
' '2" July 31, 1981
~
UNITED STATES NUCLEAR REGUIATORY COMMISSION tg '
WASHING *ON, D.C. 20555 "r
ATTENTION:
Mr. Darrell G. Eisenhut, Director gG 0 4N k
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket 50-412, CPPR 105
(~~~
pp Q
'6 Qualification of Inspection, Examination, and Testing d
b and Audit Personnel
'4 g
Gentlemen:
This letter is in response to your generic letter 81-01 which requested our position on Regulatory Guides 1.58 revision 1 (positions C.5, 6, 7, 8, and 10) and 1.146 (August 1980).
REGULA'IORY GUIDE 1.58 Revision 1 Position C.5 Unit 2 Level III personnel are capable of reviewing and approving inspection, examination, and testing procedures and of evaluating the adequacy of such procedures to accomplish the inspection, examination, and testing objectives.
Position C.E and C.10 The initial qualifications of individuals to Levels I, II, or III will generally be to the education and experience recommendations of ANSI N 45.2.6-1978. However, in certain instances as j
i determined by appropriate management, qualifications may alternatively be j
determined through test results and/or demonstration of capabilities.
j Appropriate documentation will be generated for all qualifications.
j Individual requalifications will meet or exceed the recommendation of the standard.
Paragraph 3.5.1 of the Standard lists recommended education and exper-ience for qualification to Level I.
Unit 2 will also accept a four year college degree plus one month of related experience or eqaivalent inspection, examination, or testing activities.
l Position C.7 The method of qualification at the site is to qualify personnel to a specific inspection, examination, or test function rather than to a generic type descipline.
As a result, any individual utilized I
on a test or inspe;; tion will have been qualified to that specific task.
Unit 2 meets the intent of this requirement.
I pl
~
h' g-8108050315 810731 PDR ADOCK 05000412 A
O'
~
Mr. Darrell G.
Eisenhut Generic Letter 81-01 l
July 31, 1981 Page 2 Position C.8 At present, there is no radioactive material on the construction site except for radiography. material which is controlled by an ALARA program.
When fuel is loaded, the Operations Quality Assurance Program will be in effect and will institute an ALARA program for the site.
Beaver Valley Unit 2 meets the intent of this requirement.
SUMMARY
As of January 1, 1982, 41] pro:edure revisions necessary to meet or exceed the requirements of the Regulatory Guide will be completed and implemented.
REGULATORY GUIDE 1.146 AUGUST 1980 As of January 1,1982, the Duquesne Light Company Quality Assurance Department will comply with the requirements of Regulatory Guide 1.146 (August 1980) with the exception of one. individual.
The individual will be qualified as an audit team leader under the existing Duquesne Light Company Quality Assurance Department Program.
This individual will (1) meet the ANSI N45.2.23' requirements for education, rights of management, and communication skills, (2) have received training to the extent necessary to assure her competence in auditing skill, (3) have passed a lead auditor examination, and (4) have participated in a minimum of five (5) nuclear quality assurance audits before being assigned as an audit team i
leader. When acting as an audit team leader, she will be accompanied by an individual qualified as a lead auditor in accordance with ANSI N45.2.23
- 1978Property "ANSI code" (as page type) with input value "ANSI N45.2.23</br></br>- 1978" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process..
t 4
DUQUESNE LIGHT COMPANY By
.([.'90olever cc:
Mr. V.
Stello, Director (15)
Office of Inspection and Enforcement Mr. B. H. Grier, Director Region 1 Mr. K. Jabbour, Project Manager Licensing and Review