ENCLOSURES TRANSMITTED HG.'U //iTH
'
CONTAIN 10 CFR 2.790 INF,ORMATION
a
jg
.
,
y
k
UNITED STATES
NUCLEAR REGULATORY COMMISSION
y,
y
g
.!
REGION I
-
-
O
J
631 PARK AVENUE
s
% ** V
,o#
KING OF PRUSSIA, PENNSYI VANIA 19406
gg
Docket No. 50-334
s
Duquesne Light Company
p%g
ATTN:
Mr. J. J. Carey
[
V
Vice President
p
/f
QN
Nuclear Division
[
/
Post Office Box 4
2
6
J[j[ 2 7/Sg g I-g
Shippingport, Pennsylvania 15077
t[ g
%
m
%
Gentlemen:
s
Subject:
Inspection No. 50-334/80-27
(
@
This refers to the routine inspection conducted by Messrs. D. A. Beckman and
J. D. Hegner of this office on September 12-November 8, 1980 at the Beaver
Valley Power Station, Unit 1, Shippingport, Pennsylvania of activities author-
ized by NRC License No. DPR-66 and to the discussions of our findings held by
Mr. Beckman with you and members of your staff periodically during the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations by the inspector.
s
Our inspector also verified the steps you have taken to correct the item of
ncncompliance brought to your attention in a letter dated February 26, 1980.
W9 have no further questions regarding your action at this time.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
These
items of noncompliance have been categorized into the levels as described in
our correspondence to ycu dated December 31, 1974.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to
submit to this office, within twenty (20) days of your receipt of this notice,
a written statement or explanation in reply including:
(1) corrective steps
which have been taken b/ you and the results achieved; (2) corrective steps
which will be taken to avoid further items of noncompliance; and (3) the date
when full compliance will ce achieved.
Additionally and in accordance with Section 2.790(d) of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations, documentation of
findings of your control and accounting procedures for safeguarding special
nuclear materials and your facility security measures for physical protection
are deemed to be commercial or financial information within the meaning of 10
8108040564 810625
PDR ADOCK 05000334
p
0
I
ENCLOSURES TRANSMITTED HEREWITH
CONTAIN 10 CFR 2.790 INFOU.'ATiON
I# [
>
'
'
ENCLOSURES TRANSMITTED HERE7/ITH
CONTAIN 10 CFR 2.790 INFORMATION
,
,
Du'quesne Light C ipany
2
-
.
JUN 251981
.
,
CFR 9.5(a)(4) and shall be subject to disclosure only in accordance with the
provisions of 10 CFR 9.12; therefore, the pertinent section of the enclosed
inspection recort will not be placed in the Public Document Room and will
receive limited distribution.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
.,
g :: ' "
R.R.Kehig,
f
Projects Branch #2, Division of
Resident and Project Inspection
-
,
Enclesures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
'
Report No. 50-334/80-27 (Contains 2.790(d) Information)
cc w/ encl:
,
F. Bissert, Technical Assistant Nuclear (Without Pages 27-31 of Report)*
"
R. Washabaugh, QA Manager (Without Pages 27-31 of Report)*
i
Station Superintendent (Without Pages 27-31 of Report)*
General Superintendent, Power Stations Department (Without
Pages 27-31 of Report)"
R. Martin, Nuclear Engineer (Without Pages 27-31 of Report)*
J. Sieber, Superintendent of Licensing and Compliance, BVPS (Without Pages
27-31 of Report)*
j
T. D. Jones, Nuclear Operations (Without Pages 27-31 of Report)*
R. M. Mafrice, Nuclear Engineer (Without Pages 27-31 of Report)*
N. R. Tonet, Manager, Nuclear Engineering (Without Pages 27-31 of Report)*
.
!